AirPlus DMR-6000 Installation, Operation And Maintenance Manual

Advertisement

INSTALLATION, OPERATION,
AND MAINTENANCE MANUAL
DMR-6000

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DMR-6000 and is the answer not in the manual?

Questions and answers

Summary of Contents for AirPlus DMR-6000

  • Page 1 INSTALLATION, OPERATION, AND MAINTENANCE MANUAL DMR-6000...
  • Page 2 24 hours of operation and upon start-up. The DMR-6000 can be installed in the supply duct of any air handling system. The goal of the technology is to introduce ions to the airflow and have them delivered to the occupied space, so mount the DMR-6000 as close to the supply diffusers as possible.
  • Page 3 A transformer used to power the product must be grounded. Ideally, a dedicated 24V AC transformer be used to power the DMR-6000. If this is not pos- sible, power from a transformer serving other equipment may be used if sized adequately to handle the additional VA rating of the DMR-6000.
  • Page 4 Circuit utilizes a relay with normally closed contacts. The contacts are open whenever the unit is not powered or there is a fault in the system. When the DMR-6000 is operating normally and pro- ducing ions, the contacts close and the LED on the outside of the unit will illuminate. Connect the BMS control wires to the BMS terminal block on the outside of the unit.

Table of Contents