Aligning The Wall Plate - GE PVM9179 Series Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

ALIGNING THE WALL PLATE

D
Hole A
Hole C
CAUTION:
fingers on sharp edges.
Draw a vertical line on the wall at the center of the 30
1
wide space.
2
Use the mounting plate as the template for the rear wall.
Place the mounting plate on the wall, making sure that
the tabs are touching the bottom of the cabinet or
the mounting plate to the center line on the wall.
3
While holding the mounting plate with one hand, draw
circles on the wall at holes A, B, C and D (see illustration
above/actual plate marked with arrows) . Four holes
must be used for mounting.
Installation Instructions
Area E
10
Draw a
Vertical Line
on Wall from
Center of Top
Cabinet
NOTE: Holes C and D are inside area E. If neither C nor D
is in a stud, find a stud somewhere in area E and draw a
fifth circle to line up with the stud. It is important to use
at least one wood screw mounted firmly in a stud
to support the weight of the oven.
Set the mounting plate aside.
WARNING:
inside walls or cabinets.
4
Drill holes on the circles. If there is a stud, drill a
for wood screws. For holes that don't line up with a stud,
drill a
hole for toggle bolts.
5 8
NOTE: DO NOT MOUNT THE PLATE AT THIS TIME.
Hole B
Hole D
hole
3 16

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Psa9120 seriesPsa9240 seriesPvm9179dfccPsa9120sfss

Table of Contents