International comfort products R80ESL Installation, Start-Up, Operating And Service And Maintenance Instructions page 26

Single stage, multi-speed ecm, non–condensing gas furnace input capacities: 45,000 thru 155,000 btuh
Hide thumbs Also See for R80ESL:
Table of Contents

Advertisement

R80ESN/R80ESL(Series A): Installation, Start–Up, Operating and Service and Maintenance Instructions
1. Maintain 115-v wiring and ground. Improper polarity will result in
rapid flashing LED and no furnace operation.
2. Make thermostat wire connections at the 24-v terminal block on the
furnace control. Failure to make proper connections will result in
improper operation (see
Fig.
3. Gas supply pressure to the furnace must be greater than 4.5-In.
W.C. (0.16 psig) but not exceed 14-In. W.C. (0.5 psig).
4. Check all manual-reset switches for continuity.
5. Install blower compartment door. Door must be in place to operate
furnace.
6. Replace outer door.
CAUTION
!
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear
appropriate protective clothing, safety glasses and gloves when
handling parts and servicing furnaces.
Start-Up Procedures
WARNING
!
FIRE AND EXPLOSION HAZARD
Failure to follow this warning could cause personal injury, death and/or
property damage.
Never test for gas leaks with an open flame. Use a commercially
available soap solution made specifically for the detection of leaks to
check all connections.
1. Purge gas lines after all connections have been made.
2. Check gas lines for leaks.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
24).
Fig. 44 – Service Label
!
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury, or death.
Blower access door switch opens 115-v power to control. No
component operation can occur unless switch is closed. Caution must
be taken when manually closing this switch for service purposes.
3. To Begin Component Self-Test:
Remove blower access door. Disconnect the thermostat R lead from
the furnace control board. Manually close the blower door switch
closed. Short (jumper) the COM-24v terminal on control to the
TEST/TWIN 3/16-inch quick connect terminal on control until
LED goes out (approximately 2 sec). Gas valve and humidifier will
not be turned on (see
Fig.
NOTE: The furnace control allows all components, except the gas
valve, to be run for short period of time. This feature helps diagnose a
system problem in case of a component failure. Component test feature
will not operate if any thermostat signal is present at the control.
4. Component test sequence is as follows (see service label attached to
furnace or
Fig.
44):
a. LED will display previous status code 4 times.
NOTE: If no previous code is present, go directly to b.
b. Inducer motor starts and continues to run until Step f of
component test sequence.
c. Hot surface igniter is energized for 15 sec., then off.
d. Blower motor operates on HEAT speed for 10 sec.
e. Blower motor operates on COOL speed for 10 sec.
f. Inducer motor stops.
g. Reconnect R lead to furnace control board, release blower door
switch and re-install blower door.
5. Operate furnace per instruction on door.
6. Verify furnace shut down by lowering thermostat setting below
room temperature.
7. Verify furnace restarts by raising thermostat setting above room
temperature.
26
WARNING
28).
A14637

Advertisement

Table of Contents
loading

This manual is also suitable for:

R80esnA series

Table of Contents