Advertisement

Quick Links

U.S. AICKSN Technology Co.,Ltd.
Address:250 w clifton st tampa,FL.33614
Fujian Aicksn Environmental Technology Co., Ltd.
F4, No. 5, Fangshan South Road, Xiang'an Dist.,
Xiamen, Fujian, China
Tel:0086 0592-5776975
0086 0592-5569172
www.aicksn.com
info@aicksn.com
USER MANUAL
(AICKSN Large Flow Water Filtration Systems )
(MA 400 Standard System)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MA1-A400 and is the answer not in the manual?

Questions and answers

Summary of Contents for AICKSN MA1-A400

  • Page 1 USER MANUAL (AICKSN Large Flow Water Filtration Systems ) (MA 400 Standard System) U.S. AICKSN Technology Co.,Ltd. Tel:0086 0592-5776975 Address:250 w clifton st tampa,FL.33614 0086 0592-5569172 www.aicksn.com Fujian Aicksn Environmental Technology Co., Ltd. info@aicksn.com F4, No. 5, Fangshan South Road, Xiang'an Dist.,...
  • Page 2: Table Of Contents

    Contents Introduction System Includes Products Specifications Installation Requirements Installation Tools Main Components Installation Steps Special Notes Warranty (MA 400 Standard System)...
  • Page 3: Introduction

    Introduction System Includes Welcome to use AICKSN commercial large flow filtration systems. Users must MA1-A400 MA2-2A400 MA3-3A400 MA4-4A400 strictly follow the installation specifications explained in this User Manual and all 1 Stage Manifold 1set 2 Stages Manifold 1set 3 Stages Manifold 1set 4 Stages Manifold 1set installation or maintenance should be performed by professional staff.
  • Page 4: Installation Requirements

    Installation Requirements Main Components MA1-A400 1. Please reserve the installation location for the filtration system and the neces- sary operation and maintenance space around it. 2. The quality of the incoming water must comply with the municipal tap water. The temperature of the incoming water must be controlled between 5 and 38°C.
  • Page 5: Main Components

    Main Components Main Components MA2-2A400 MA3-3A400 1.2 Stages Manifold 1set 2.ACF Filter 20” 2pcs 1.3 Stages Manifold 1set 3.1/2” Connector 2pcs 2.ACF Filter 20” 3pcs 4.Red Buckle 2pcs 3.3/4” Connector 2pcs 5.Silicone Oil 1 pack 4.Red Buckle 2pcs 6.Straight Valve 1pc 5.Silicone Oil 1 pack 6.Straight Valve 1pc...
  • Page 6: Installation Steps

    Main Components Installation Steps 1. After open the carton, handle out components with care to avoid hitting the MA4-4A400 pressure gauge. 2. Apply silicone oil to the connection position on top of cartridge, and then screw it into the manifold. 3.
  • Page 7: Warranty

    5. If your machine appears abnormal, please unplug it immediately, turn off the water source and contact with us at www.aicksn.com or email your request to tech@aicksn.com...

This manual is also suitable for:

Ma2-2a400Ma3-3a400Ma4-4a400

Table of Contents