Download Print this page

Table Of Contents - Cisco Aironet 1815i Getting Started Manual

Advertisement

6
Preparing the AP for Installation
Before you mount and deploy your access point, we recommend that you perform a site survey (or use
the site planning tool) to determine the best location to install your access point.
You should have the following information about your wireless network available:
• Access point locations.
• Access point mounting options: on a wall or a ceiling only.
You can mount the access point above a suspended ceiling but you must purchase
Note
additional mounting hardware: See
on page 18
• Powered by 802.3af, through PoE from a network device or a PoE power injector or hub (usually
located in a wiring closet).
Access points mounted in a building's environmental airspace must be powered using PoE
Note
to comply with safety regulations.
Cisco recommends that you make a site map showing access point locations so that you can record the
device MAC addresses from each location and return them to the person who is planning or managing
your wireless network.
7
Installation Overview
Installing the access point involves these operations:
Step 1
Step 3
Step 4
14
for additional information.
"Mounting and Grounding the Access Point" section
(optional)

Advertisement

loading