Wood Stove Owner's Manual Part 2 of 2 INSTALLATION AND OPERATION REQUIREMENTS BLUE RIDGE 100 (ESW0001 model) US Environmental Protection Agency phase II certified wood stove compliant with 2020 cord wood standard Safety tested according to ULC S627, UL 1482 and UL 737 standards by an accredited laboratory.
Page 2
If it can not be provided, the warranty period will be determined by the date of manufacture of the product. It is also highly recommended to register the warranty online at https://www.englander-stoves.com/ca/en/warranty-registration/ Registering the warranty will help to quickly find the information needed on the unit.
Tested and certified in compliance with CFR 40 part 60, subpart AAA, section 60.534(a)(1(ii) and ASTM E3053 based on the ALT-125 sent by EPA on February 28 , 2018. Carbon monoxide. Installation and Operation Requirements - Blue Ridge 100 Page 5...
Z240 MH standard. Tested and certified in compliance with CFR 40 part 60, subpart AAA, section 60.534(a)(1(ii) and ASTM E3053. Based on ALT-125 sent by EPA on February 28th, 2018. Page 6 Installation and Operation Requirements - Blue Ridge 100...
Leave to burn with the primary air control open for approximately 10 minutes and then close the primary air control completely for the low burn rate and halfway for the medium burn rate. Installation and Operation Requirements - Blue Ridge 100 Page 9...
13 ½" (343 mm) 13 ½" (343 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Page 10 Installation and Operation Requirements - Blue Ridge 100...
Page 11
48" Flush 48" 36" 122 cm 92 cm Figure 7: Clearances - Top Figure 8: Clearances - Corner 84" 213 cm Figure 9: Clearances - Side Installation and Operation Requirements - Blue Ridge 100 Page 11...
Page 12
The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Page 12 Installation and Operation Requirements - Blue Ridge 100...
Page 13
14 ½" (368 mm) 14 ½" (368 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - Blue Ridge 100 Page 13...
Page 14
The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Page 14 Installation and Operation Requirements - Blue Ridge 100...
Page 15
16 ½" (419 mm) 16 ½" (419 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - Blue Ridge 100 Page 15...
Page 16
122 cm 92 cm Les distances de tuyau listées dans ce tableau se réfèrent aux distances obtenues lorsque le poêle est installé en accord avec les dégagements de l’appareil mentionnés ci-dessus. Page 16 Installation and Operation Requirements - Blue Ridge 100...
The floor protection at the back of the stove is limited to the stove’s required clearance if such clearance is smaller than 8 inches (203 mm). Only required under the horizontal section (Ho) of the connector. Must exceed each side of the connector by at least 2 inches (51 mm). Installation and Operation Requirements - Blue Ridge 100 Page 17...
Mounting hardware must not be located closer than 8" (200 mm) from the vertical centre line of the appliance. G) Edge clearance for ceiling shields to side and back walls: 3" (75 mm) Shield extension beyond each side of the appliance: 18" (450 mm) Page 18 Installation and Operation Requirements - Blue Ridge 100...
Page 20
Brick, with a minimum of 24 gauge (0.61 mm) sheet metal backing, spaced out at least 1" (25 mm)* by non-combustible spacers 12" (305 mm) * In Canada this space can be ⅞" (21 mm) Page 20 Installation and Operation Requirements - Blue Ridge 100...
(HVAC type, must meet ULC S110 or UL 181 class 0 or class 1) (B), sold separately. Refer to air intake kit installation instructions for more details. Installation and Operation Requirements - Blue Ridge 100 Page 21...
Lift the fire screen upwards and push the bottom part towards the stove then let the fire screen rest on the bottom of the door opening. Warning: Never leave the stove unattended while in use with the fire screen. Page 22 Installation and Operation Requirements - Blue Ridge 100...
Ensure that the blower’s power cord is not in contact with any surface of the stove to prevent electrical shock or fire damage. Do not run the power cord beneath the stove. Installation and Operation Requirements - Blue Ridge 100 Page 23...
Put the baffle in place. Repeat steps 1 and 2 for the three other tubes. To remove the tubes use the above steps in reverse order. Page 24 Installation and Operation Requirements - Blue Ridge 100...
Page 25
Note that secondary air tubes (B) can be replaced without removing the baffle board (A) and that all tubes are not necessarely identical (look at the part number on the tube). Installation and Operation Requirements - Blue Ridge 100 Page 25...
THE IMAGES SHOWN ARE FOR GUIDANCE ONLY AND MAY BE DIFFERENT FROM YOUR PRODUCT, BUT THE ASSEMBLY REMAINS THE SAME. For a stove on a pedestal, screw the base on the floor with the proper hardware (O). Page 26 Installation and Operation Requirements - Blue Ridge 100...
Reinstall the glass, being careful to centre the glass in the door and not to over-tightening the retaining screw. The two main causes of broken door glass are uneven placement in the door and over-tightening the retaining screws. Installation and Operation Requirements - Blue Ridge 100 Page 27...
. Page 28 Installation and Operation Requirements - Blue Ridge 100...
Page 29
Using a flat screwdriver, turn the adjustable hinge rods in the direction shown to adjust the doors. Tighten all door hinge pressure screws when they are at the desired positions. Configurations 1-2-3-4-5-6, show in which direction these act on the adjustment of the door. Installation and Operation Requirements - Blue Ridge 100 Page 29...
Page 30
Leave about ½" long of the gasket when cutting and press the end into the groove. Tuck any loose fibers under the gasket and into the silicone. Close the door. Do not use the stove for 24 hours. Page 30 Installation and Operation Requirements - Blue Ridge 100...
8. Exploded Diagram and Parts List Installation and Operation Requirements - Blue Ridge 100 Page 31...
Page 32
44028 CERAMIC THERMODISC F110-20F AC02050 BLOWER ASSEMBLY WITH VARIABLE SPEED CONTROL (UP TO 100 CFM) 60013 POWER CORD 96" X 18-3 type SJT (50 pcs per carton) 44085 RHEOSTAT KNOB Page 32 Installation and Operation Requirements - Blue Ridge 100...
Page 33
Item Description AC01336 5"Ø FRESH AIR INTAKE KIT FOR WOOD STOVE ON PEDESTAL 44028 CERAMIC THERMODISC F110-20F 44080 RHEOSTAT WITHOUT NUT (MODEL KBMS-13BV) Installation and Operation Requirements - Blue Ridge 100 Page 33...
90 days *Subject to limitations above **Picture required Shall your unit or a components be defective, contact immediately your ENGLANDER dealer. To accelerate processing of your warranty claim, make sure to have on hand the following information when calling: •...
Page 35
Installation and Operation Requirements - Blue Ridge 100 Page 35...
Page 36
Resale is strictly prohibited. The manufacturer may update St-Augustin-de-Desmaures (Québec) Canada this document from time to time and cannot be responsible G3A 2H3 for problems, injuries, or damages arising out of the use 1-877-356-6663 of information contained in any document obtained from https://www.englander-stoves.com/ unauthorized sources. tech@sbi-international.com...
Need help?
Do you have a question about the BLUE RIDGE 100 and is the answer not in the manual?
Questions and answers