Download Print this page

Safavieh Outdoor PAT7030 Manual page 6

Advertisement

PREPARATION
* * Be Bef f or ore beginning assembly of pr
e beginning assembly of product, mak
*If any part is missing or damaged, do not a�empt to assemble the product.
* Es�mated Assembly Time : 10 minutes.
* Tools Requied for Assembly (included): Allen Key
3
* If you are having dificulty, our friendly Customer care team is always here to help. Please email customersupport@safavieh.com
Step 3
Step
A�ached Leg frame (A) to (B),(C).Using
A�ached Leg frame (A) to (B),(C).Using
Screw(HW1) �ghten by (HW4),and Bolt (HW2) and Sleeve nut(HW3)
�ghten by (HW4).
�ghten by (
oduct, make sur
e sure all parts ar
e all parts are pr
e presen
HW3
HW2
HW2
HW1
esent. Compar
t. Compare parts with pack
e parts with packag age c
4
Step
Step 4
Put Back Cushion (CSH1) and Seat Cushion (CSH2) on the
Chair. The Chair is ready to be used
e con
ont t en ents lis
ts list and har
t and hardw
dwar are c
e con
CSH1
ont t en ents lis
ts list. t.
CSH2

Advertisement

loading