Download Print this page

Safavieh Outdoor PAT7030 Manual page 3

Advertisement

PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
* Es�mated Assembly Time : 10 minutes.
* Tools Requied for Assembly (included): Allen Key
* If you are having dificulty, our friendly Customer care team is always here to help. Please email customersupport@safavieh.com
3
Step
Step 3
A�ached Leg frame (A) to (B),(C).Using
A�ached Leg frame (A) to (B),(C).Using
Screw(HW1) �ghten by (WH4),and Bolt (HW2) and Sleeve nut(HW3)
�ghten by (
�ghten by (WH4).
4
HW3
HW2
HW2
A
HW1
Step
Step 4
Put Back Cushion (CSH1) and Seat Cushion (CSH2) on the
Chair. The Chair is ready to be used
CSH1
CSH2

Advertisement

loading