Saeco Incanto RONDO Service Manual page 24

Hide thumbs Also See for Incanto RONDO:
Table of Contents

Advertisement

EN Incanto DOT.indd
24
Phase 17
Distribute the grease uniformly and generously
on the entire toothed wheel.
Phase 18
Apply grease also on the teeth of the worm gear
on the grinder motor shaft.
Phase 19
Couple the motor flange with the rest of the unit
as shown in the figure.
Phase 20
Insert the locking pins as shown in the figure
and press fully down.
18/05/2005, 12.05
24

Advertisement

Table of Contents
loading

Table of Contents