Installation; Grounding; Tubing Lengths; Install - Graco 24M224 Instructions Manual

Hopper or hose heat circulation kit
Table of Contents

Advertisement

Installation

Installation

Grounding

The equipment must be grounded. Grounding reduces
the risk of static and electric shock by providing an
escape wire for the electrical current due to static build
up or in the event of a short circuit.
1. Remove grounding screw on diaphragm pump (3)
and tighten ring terminal on grounding cable (15)
under ground screw.
15
2. Loosen grounding lug locknut (W) on back of control
box. Insert ground wire end (Y) into lug slot and
tighten locknut securely.
14

Tubing Lengths

The length of tubing (4, 16, 29) is determined by the
hopper mounting configuration and heating choices.
Reference the fluid schematic, from the configurations
listed below, to find the tubing lengths.
Cut tubing to length specified in fluid schematics.
1. Use tubing cutter to cut tubing (4) squarely to
NOTE: To ensure a leak-proof seal, apply PTFE tape
on all npt threads.
2. Insert tubing through the back of the nut in each of

Install

Y
1. XM Kit 256273 only: Mount bracket (1) on XM
r_256273_313259_9
Y
2. XP Kit 24M224 only: Mount brackets (101, 102) on
W
r_256273_313259_10
Get other manuals https://www.bkmanuals.com
Heating hoppers only. See F
Heating hoses only. See F
Heating hoppers and hoses. See F
desired lengths.
the plastic fittings (7) until the tube stops. Tighten
the nut hand tight, then tighten it to 1-1/2 to 2 turns
with a wrench.
frame (D) using screws (5).
5
1
D
r_256273_313259_5
XP frame (D) using plates (105), screws (134),
nuts (133).
134
102
105
133
ti19176a
. 2 on page 9.
IG
. 6 on page 13.
IG
. 4 on page 11.
IG
134
101
D
105
133
313259D

Advertisement

Table of Contents
loading

Table of Contents