Advertisement

Quick Links

SAM BOOST™ WITH
SMART NOZZLE N
P
2
QUICK START GUIDE
SAM BOOST™ SYSTEM
FULLY INSTALLED WITHOUT
ANTENNA & WATER TANK
LEVEL SENSOR

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SAM BOOST and is the answer not in the manual?

Questions and answers

Summary of Contents for Akron SAM BOOST

  • Page 1 SAM BOOST™ WITH SMART NOZZLE N QUICK START GUIDE SAM BOOST™ SYSTEM FULLY INSTALLED WITHOUT ANTENNA & WATER TANK LEVEL SENSOR...
  • Page 2 SAM BOOST™ WITH SMART NOZZLE N QUICK START GUIDE Box #1 – SAM BOOST™ Electronic Components Refer to FSG-MNL-00232 for complete listing of Safety Hazards & Warnings Sheet: FSG-MNL-00233 Revision 7 / 10 / 2023 Page: 1 of 7...
  • Page 3 SAM BOOST™ WITH SMART NOZZLE N QUICK START GUIDE Box #2 – SAM BOOST™ Valves & Venting Components Refer to FSG-MNL-00232 for complete listing of Safety Hazards & Warnings Sheet: FSG-MNL-00233 Revision 7 / 10 / 2023 Page: 2 of 7...
  • Page 4 C. Matrix Module D. SAM BOOST™ System Harness E. Cross Pump Backbone Harness with CAN Hubs F. SAM BOOST™ Display, Display Labels, Power Module, & Adapter Plate G. Alarm Buzzer (Optional) H. Master Intake & Master Discharge Pressure Sensors I. Caution Labels & Push-Pull Cover Placards 1.2 Box #2 –...
  • Page 5 7. HARNESS INSTALLATION □ Connect all Harnesses shown on System Layout □ Connect OEM Power & Ground to SAM BOOST™ Power & Ground • Do NOT wire to circuit with heavy motor loads (such as primer, foam system) • Wire to switched power source with 60 AMP protection on positive (+) side 8.
  • Page 6 SAM BOOST™ WITH SMART NOZZLE N QUICK START GUIDE 9. SOFTWARE QUICKSTART □ Assign SAM BOOST™ Display UI Layout (Password: 14000) □ Calibrate Water Tank Level Sensor (Password: 08265) 1. Fill Water Tank & Hit Button above Full icon 2. Empty Water Tank & Hit Button below the Empty icon 3.
  • Page 7 SAM BOOST™ WITH SMART NOZZLE N QUICK START GUIDE □ Calibrate Nozzle Preset (Password: 10610) Nozzle Preset Calibration will open discharge valve associated with nozzle and automatically increase line pressure. Calibration must be performed with two people 1. Engage Pump while inside Calibration Screen 2.
  • Page 8 10. FINAL COMMISSIONING CHECKLIST INITIAL PASS CRITERIA □ Verify Display shows SAM BOOST™ Splash screen while Pump in Road Mode & Transmission in Drive Gear with Two People for Safety □ Operate Preconnect Valves from Display - Full Open and Full Close (Not required to be in Pump Gear) □...

Table of Contents