Electrical Work - Mitsubishi Electric Mr.SLIM PUZ-ZM-YKA Series Installation Manual

Table of Contents

Advertisement

6. Electrical work

6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
1 Remove the service panel.
2 Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.
► Except PEA-M200, 250
B
L N
S1
S2
S3
D
For Power
For Power
► In case of PEA-M200, 250
ZM200/250, M200/250
* This terminal is open.
L
M
E
E
F
F
J
K
BH79D895W01_01en.indd
12
A
S1
S2
S3
A Indoor unit
B Outdoor unit
C
C Remote controller
D Main switch (Breaker)
E Earth
D
B
A
A
E
C
E
Fig. 6-1
PEA-M200, 250
*
N
O
E
E
F
F
Fig. 6-3
ZM200, 250
M200, 250
H
A
F Terminal block
E
G Indoor/Outdoor connection terminal block (S1, S2, S3)
H Service panel
I Clamp
* Clamp the cables so that they do not contact the center of the service panel or the gas valve.
J Earth terminal
Note :
I the protective sheet or the electrical bo is removed during servicing, be sure to
reinstall it.
Caution:
Be sure to install N-Line.
ZM200, 250Y
M200, 250Y
F
G
I
Fig. 6-2
ithout N-Line, it could cause damage to unit.
A Power supply
B Earth leakage breaker
C Circuit breaker or local switch
D LCD remote controller
E Outdoor unit
F Indoor unit
G Power cable wiring
H Indoor/outdoor connection wiring
I Grounding
J Main remote controller
K Subordinate remote controller
L Standard (Refrigerant address = 00)
M Refrigerant address = 01
N Refrigerant address = 02
O Refrigerant address = 15
L1 L2 L3 N
S1 S2 S3
en
12
2020/08/24
17:30:48

Advertisement

Table of Contents
loading

Table of Contents