Download Print this page

HP Aruba Instant On AP25 Product End-Of-Life Disassembly Instructions page 2

Advertisement

Item Description
Components, parts and materials containing
radioactive substances
2.0 Tools Required
List the type and size of the tools that would typically be used to disassemble the product to a point where components
and materials requiring selective treatment can be removed.
Tool Description
Description #1 Torx screwdriver
Description #2 Static electric tweezers
Description #3 Phillips screwdriver
3.0 Product Disassembly Process
3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Use T9 screwdriver to remove the 4 screws on the chassis.
2. Remove the top cover, use static electric tweezers to remove the antenna from the PCBA
3. Use PH2 Phillips screwdriver to remove 4 screws on the antenna cover plate
4. Remove the antenna cover plate, use PH2 Phillips screwdriver to remove two screws on the PCBA.
5. Remove the PCBA from the chassis and complete the dis-assembly.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items
contained in the product that require selective treatment (with descriptions and arrows identifying locations).
1.Use T9 screwdriver to remove the 4 screws on the chassis.
2. Remove the top cover, use static electric tweezers to remove the antenna from the PCBA.
MF877-00
Template Revision B, 18-Nov-2016
Notes
Page 2
HPE instructions for this template are available at
Tool Size (if
applicable)
T9
NA
PH2
MF877-01
Quantity
of items
included
in product
0

Advertisement

loading