Armaturenbrett ....Raadpleeg het 'Onderhouds- en garantie- Consult the ‘Maintenance and Warranty Zur Wartung vgl. das „Wartungs- und Ga- boek' voor Onderhoud. Book’ for Maintenance. rantiebuch“. vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
Make sure that the user of the vessel is supplied with the owner’s manual. vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
We do not advise fitting 2 bow thrusters into one tunnel; this does ways well clear from the maximum bilge water level. not result in doubling the thrust! vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
- The bars must be installed so they are perpendicular to the ex- pected waveform. vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
NOTE: The gaskets supplied are al- required. ready electrically insulated. However the bolts and the shaft need to be fit- ted with insulation material, for exam- ple nylon bushes. vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
(9 - 11 ft.lbf ) Check for possible leaks immediately the ship returns to wa- ter. *) A suitable grease is VETUS ‘Shipping Grease’ , Art. code: VSG. vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
Nm (6.5 - 8 ft.lbf ). This remotely controlled main switch is available for 12 or 24 Volt DC. (6.5 - 8 ft.lbf ) Vetus art. code: BPMAIN12 respectively BPMAIN24. vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
2 min. continuously or max. 2 min. per hour at 550 A (12 Volt). See table on page 3 min. continuously or max. 3 min. per hour at 315 A (24 Volt). vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
2 x 70 Ah - 12 V 2 x 145 Ah - 12 V 0 - 60 ft AWG 1 2 x BCI 91 - 650 2 x BCI 4D - 1000 vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
Manejo simultáneo de 2 tornillos de retención con 1 panel Jednoczesna obsługa dwóch pędników dziobowych przy użyciu jednego panelu Comando contemporaneo di 2 eliche di prua mediante 1 solo pannello (12 V) (12 V) vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
BP1020 Pakking 2 mm Gasket 2 mm BP1021 Pakking 1 mm Gasket 1 mm TS110 Thermische beveiliging Thermal Protection BP256 Reserve zekering 5 A Spare fuse 5 A vetus® Operation manual and installation instructions bow thrusters BOW7512D and BOW7524D 020536.06...
Need help?
Do you have a question about the BOW7512D and is the answer not in the manual?
Questions and answers