....11.1 Bedienung mit Fußschaltung Raadpleeg het 'Onderhouds- en garantie- Consult the ‘Maintenance and Warranty Zur Wartung vgl. das „Wartungs- und Ga- boek' voor Onderhoud. Book’ for Maintenance. rantiebuch“. vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
Make sure that the user of the vessel is supplied with the owner’s manual. vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
- The electric motor must be positioned in such a way that it is al- We do not advise fitting 2 bow thrusters into one tunnel; this does ways well clear from the maximum bilge water level. not result in doubling the thrust! vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
- The bars must be installed so they are perpendicular to the ex- pected waveform. vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
• Then apply anti-fouling treatment if NOTE: The gaskets supplied are al- required. ready electrically insulated. However the bolts and the shaft need to be fit- ted with insulation material, for exam- ple nylon bushes. vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
Instead of a storage battery main switch, a remotely controlled main switch annex emergency stop can be installed. This remotely controlled main switch is available for 12 or 24 Volt DC. Vetus art. code: BPMAIN12 respectively BPMAIN24. vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
If a delay is desired where one of the following operating devices is - BPSM, operating panel for side mounting, installed, a delay switch can be installed. - FSxx, foot switch button Delay: Vetus art. code: BPTD vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
111. Length of usage: See table on page107 4 min. continuously or max. 4 min. per hour at 220 A (12 Volt).. vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
Dwa przekaźniki pędnika dziobowego (K1 i K2) nie mogą nigdy być siguiente esquema. włączane w tym samym czasie. Z tego powodu w przypadku użycia pedałów nożnych, należy zainstalować dodatkowe przekaźniki, jak przedstawiono na schemacie poniżej. (12 V) vetus® Operation manual and installation instructions bow thruster BOW3512E 020523.11...
Need help?
Do you have a question about the BOW3512E and is the answer not in the manual?
Questions and answers