ZEZ SILKO SUPER PFR 12 Quick Start Manual

Advertisement

Quick Links

1.- Principal functions
- Cos φ controller
 Capacitor connection (6 or 12 steps)
- Network analyzer  Measurement of electrical parameters
- Alarm manager
Display and automatic solution
2.- Connections
A current transformer must be installed for the start-up (I
total current of the load.
The regulator power supply voltage will be two-phase, preferably L1 for U
for U
, and the current will preferably be taken from L1. It must be supplied by
L2
means of an automatic switch. See cable section and protections in the table of
technical features.
The current transformer must be placed in such
a way that it measures the total current of the
loads plus the capacitors.
The transformer for the leakage current must be
placed so that it measures the current in the
capacitor bank and must include lines L1, L2, L3
and N.
The unit has a switched relay exclusively for the alarm outlet.
2.1.- Communications
The SUPER PFR regulators can be connected to a computer or another unit by
means of the standard RS-485 bus included. This system is able to focus data
on a single registry point (Power Studio® System).
In a network of equipment, the SUPER PFR communicates by question-answer
(slave).
The SUPER PFR communicates with the MODBUS RTU© protocol, which
enables it to access the electrical parameter and the main variables and
configurations. Contact the manufacturer for the table of addresses.
See section 4.3. to change the communications configuration.
3.- Technical features
Main power supply and voltage
480, 400, 230, or 110 Vac. +15 % -10 %; 50 / 60 Hz, (see label)
measurement.
Power supply: U
Power supply cables
Section 1.5 mm
Current transformer, I
Current measurement circuit
cable section. 2.5 mm
Leakage current measurement
Nominal secondary transf. current: I
circuit
Transformer with ratio of 500: I
Current I: 0.05 to 5 A AC. (maximum overload +20 %)
Current measurement margin
Leakage current I
Measurement accuracy
Voltage and current: 1 %; cos
Approx. external temperature. Range: 0...80 ºC. Accuracy:  3 ºC
Temperature measurement
Consumption
8.2 VA (empty) ; 9.3 VA (6 relays); 11 VA (12 relays)
Output
Relays. Contacts for Umax. 250 Vac., 4 A AC., AC1.
Cabling and output relay
Cable section 1.5 mm
protection
of 6 A or gl 6 A fuse
Alarm relay
Switched relay for use exclusively for the alarms
IEC 62053-23 (2003-01) Ed. 1.0
Standards
IEC 61326-1, EN61010-1
UL 508
POWER FACTOR CONTROLLER
/ 5 A) depending on the
n
- U
. Measurement U
, U
, U
y U
L1
L2
L1
L2
L3
N
, gl 0.5 to 2 A protection fuse
2
/5 A AC., preferably on phase L1. Min.
n
2
sec = 2 mA AC.
= 1 A AC. +20%
: 0.01...1 A AC. (maximum overload +20 %)
: 2 %  1 digit
2
, protection with circuit breaker (C curve)
SUPER PFR
This manual is intended as a rapid guide to the use and operation of the SUPER PFR
controller.
Any manipulation or use of the equipment different from that specified by the
manufacturer may compromise user safety. The apparatus must be disconnected
from the power supply before carrying out any maintenance operation. In the event of
failure in the operation or the protections, the unit must be left out of service and its
reconnection must be prevented until the problem has been corrected.
and L2
L1
Safety /Insulation
Protection degree
Admissible environmental
conditions
Control system
Communications
The SUPER PFR regulator
measures and operates in 4
quadrants according to the
attached diagram.
SUPER PFR
Only for
SUPER PFR 12
SUPER PFR
Category III, Class II , according to EN 61010-1
IP40 (equipment mounted, cabinet front panel)
IP30 (equipment not mounted) according to EN-60529
Temperature: -20...+60 ºC; Relative humidity: max. 95 %
(without condensation). Max. altitude: 2000 m
FCP (a programme that minimises the number of operations)
Interface: RS-485.
Protocol MODBUS.
Speed: 9600, 19200, 38400
M98235804-03-11D

Advertisement

loading

Summary of Contents for ZEZ SILKO SUPER PFR 12

  • Page 1 Only for The transformer for the leakage current must be SUPER PFR 12 placed so that it measures the current in the capacitor bank and must include lines L1, L2, L3 and N.
  • Page 2 (On: always alight, Off: always out, Auto: it goes out after 5 minutes if no key is pressed). Pod Cerným lesem 683, Žamberk, Czech Republic Technical service For any inquiry about the regulator operation or in case of malfunction please ZEZ SILKO contact technical service. Tel. +420 465 673 111 Fax.+420 465 612 319 E-mail : zez@zez-silko.cz...