3 Replacement or Installation of a Hot-pluggable IMS Module Important Information Regarding Hot-Pluggable IMS Modules ....4 BPE-2010 - Backplane Port Expander 5 RoHS and WEEE...
• Take note of the chapter "Power Supply". 2.1 Product Documentation Detailed product documentation is provided on a USB flash drive delivered with the Meinberg system. The manuals can also be downloaded from the Meinberg website at https://www.meinbergglobal.com, where you can enter your system name into the search box at the top of the page to find the relevant manual.
ESD-proof bags that are crumpled or have holes cannot provide effective protection against electrostatic discharges. ESD-proof bags must have a sufficient electrical resistance and must not be made of conductive metals if the device has a lithium battery fitted on it. BPE-2010 Date: September 27, 2022...
In the event that a power supply unit is no longer working (e.g. defective), please return it to Meinberg for repair. Failure to observe these safety instructions may result in serious injury and/or property damage.
Make sure that the module is securely locked into the connector block before you fasten the two screws. Now you can put the installed module into operation. Attachment points of an 1U IMS system BPE-2010 Date: September 27, 2022...
Operating System, the configuration of some IMS modules may be reset to factory defaults! Information: The NTP service and access to the web interface will be unavailable while the CPU is not installed. Management and monitoring functions will also be disabled. Date: September 27, 2022 BPE-2010...
WEEE-compliant fashion, it can be returned to the manufacturer. Any transportation ex- penses for returning this product (at end-of-life) must be covered by the end user, while Meinberg will bear the costs for the waste disposal itself. Date: September 27, 2022...
Need help?
Do you have a question about the BPE-2010 and is the answer not in the manual?
Questions and answers