Condensate Piping - ECR International Utica Boilers UCS 240 Installation, Operation & Maintenance Manual

Condensing gas fired boiler
Table of Contents

Advertisement

FIGURE 6-30 Condensate Drain
Do not glue cap
on if used for dust
protection. End
must be left open
Condensate Tee
(field installed)
on condensate
drain pipe
Do not place in
environment with
temperatures
below freezing.
Condensate
outlet will block if
condensate freezes
6 - COMBUSTION AIR AND VENT PIPING

6.13 Condensate Piping

• Use materials acceptable to authority having jurisdiction. In
absence of such authority:
• USA - PVC or CPVC per ASTM D1785/D2845 Cement or
primer per ASME D2564 or F493.
• Canada - CSA or ULC certified PVC/CPVC pipe, fittings
and cement.
• Connect condensate hose, hose clamps, and coupling to
boiler drain trap as shown in figure 6-30.
• Connect condensate piping to 3/4" NPT coupling as
shown.
• Slope condensate drain pipe minimum 1/4" per foot
(21mm/m) away from boiler.
• Use field source condensate pump if boiler located below
disposal point.
• Field source condensate neutralizing kit as required
by authority having jurisdiction or for environmentally
friendly condensate disposal.
37
PN 240011654, Rev. J [01/31/2020]