ECR International Utica Boilers UB90-50 Installation, Operation & Maintenance Manual page 39

Gas-fired, direct vent, condensing, hot water boiler
Table of Contents

Advertisement

DETAILED SEQUENCE OF OPERATION
End Of Normal Sequence Of Operation
Thermostat ends call for heat.
Gas valve and circulator pump are
de-energized, valve and flame lights go out.
Blower runs for 30 seconds post purge,
purge light is on.
Blower is de-energized after 30 seconds,
purge light shuts off.
Boiler stand by for next call for heat.
39
P/N 240010135 Rev. D [04/15/2017]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Utica boilers ub90-75Utica boilers ub90-100

Table of Contents