Combustion Air And Vent Pipe - ECR International Utica Boilers UB90-50 Installation, Operation & Maintenance Manual

Gas-fired, direct vent, condensing, hot water boiler
Table of Contents

Advertisement

Connections And Termination
Provisions for combustion and ventilation air must be
in accordance with section, Air For Combustion and
Ventilation, of the National Fuel Gas Code,ANSI 2223.1/
NFPA54, or National Gas and Propane Installation Code,
CAN/CGA-B 149.1, or applicable provisions of the local
building code.
Boilers require dedicated direct vent system. All air for
combustion is taken directly from outdoors through
combustion air intake pipe. All flue products are discharged
to outdoors through vent pipe.
1.
Venting Materials:
!
WARNING
Use of cellular core PVC (ASTM F891), cellular core
CPVC, or Radel® ,(Polyphenolsulfone) in venting
systems could result in death, or serious injury.
!
WARNING
Covering non-metallic vent pipe and fittings with
thermal insulation shall be prohibited. Use in venting
system could result in death or serious injury.
Table 4 - Combustion air and vent pipe fittings
must conform with the following:
Item
Material
PVC schedule 40
PVC - DWV
CPVC schedule 40
SDR-21 & SDR-26 PVC
Vent Pipe
and Fittings
ABS-DWV
Schedule 40ABS
PP (Polypropylene)
Pipe and Components
PVC
Pipe
Cement/
CPVC
Primer
Schedule 40 ABS
• IPEX is approved vent manufacturer in Canada listed
to ULC-S636.
• IPEX System 636 Cements and Primers are approved
in Canada listed to ULC-S636.
Use of cellular core PVC (ASTM F891), cellular core CPVC, or Radel
(Polyphenolsulfone) in venting systems shall be prohibited.
NOTICE
Use of PP piping, follow manufacture's installation
instructions and requirements.

COMBUSTION AIR AND VENT PIPE

Standards
ANSI/ASTM D1785
ANSI/ASTM D2665
ANSI/ASTM D1784/
F441
ANSI/ASTM D2241
NOT APPROVED FOR
CANADA
ANSI/ASTM D2661
ANSI/ASTM F628
UL 1738
ULC S636-08
ANSI/ASTM D2564
ANSI/ASTM F493
ANSI/ASTM D2235
,
®
22
2.
Canadian installations:
• First 3 feet (900mm) of venting must be readily
available for visual inspection.
• Specified primers and glues of certified vent
system must be from single manufacturer, and not
intermixed with other manufacturer's vent system
parts.
• Components of the certified system must not be
interchanged with other vent systems, or unlisted pipe
and/or fittings.
NOTICE
Transition from 2" pipe to 3" pipe must be made in
vertical run.
3.
Boiler combustion air and vent piping connections are
sized for 2" pipe. Any pipe size change (to 3") must be
made outside of boiler casing in vertical run of pipe to
allow for proper drainage of vent condensate. Due to
potential for flue gas temperatures over 155°F, first five
(5) feet of vent pipe must be CPVC, the remaining vent
pipe can be PVC. If any elbows are employed within the
first 5 feet of vent, they must be CPVC also. Two (2) - 30"
pieces of 2" CPVC pipe. 2½" piece of 2" CPVC pipe, a 2"
CPVC elbow and 2" CPVC pipe coupling are furnished with
the boiler. No requirement when using PP pipe.
4.
Combustion air and vent piping lengths. Table 5,
Page 23. If vent exceeds 5 ft. first 5 ft. of vent piping
run must be 2" CPVC:
Length of pipe is counted from boiler jacket (air
intake pipe) or from vent pipe connector(vent pipe).
Termination is not counted toward the "Total Equivalent
Length".
For elbows, reduce maximum vent length as shown:
• 2" 90° elbow - 2 ft. per elbow.
• 3" 90° elbow - 3 ft. per elbow.
To add two (2) 90° elbows to a 3" pipe for a 75 boiler.
Each elbow is 3 ft. per 90° elbow for a total of 6 ft.
(1 elbow @ 3 ft. + 1 elbow @ 3 ft. = 6 equivalent ft. of
pipe)
Total additional pipe is then subtracted from maximum
allowable pipe length to give new maximum length of
112-6=106 ft. with two (2), 90° elbows.
"TOTAL EQUIVALENT LENGTH":
Original 112 ft. max. - 6 equivalent ft. for 2 elbows =
new 106 ft. maximum length.
Example:
P/N 240010135 Rev. D [04/15/2017]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Utica boilers ub90-75Utica boilers ub90-100

Table of Contents