Page 1
S h e nz he n K am a da E l ec t r o ni c C o . , L t d We b: www. k m dpo w e r . c o m E -ma il: mar k e t i ng@k m d po w e r . co m Ad dress : Bu ild in g 4 , Ma sh ax uda H i gh- t ec h l n du s t ry P ark , Pi ngdi Street, Lo n gg a ng Di st r ic t 51 81 17, S h enz he n, G u a ng don g , P .
Page 3
Iron phosphate-lithium power battery Long warranty period:5 years RS485 RS232 PARALLEL-RS485 4 3 2 1 ON/OFF RUN ALM MENU ENTER DOWN...
Page 4
2.4 Mounting the Unit Consider the following points before selecting where to install: · Do not mount the battery on flammable construction materials. · The ambient temperature should be between 0°C and 45°C to ensure optimal operation. · The recommended installation position is to be adhered to the wall vertically. ·...
Page 9
4.6 Connection for Parallel Mode 1. The ADD address of this battery wired with the inverter is 1, other batteries dial the corresponding address according to the dial code address rule 2. Continuous current 100A. 6AWG or 4AWG wire is recommended for the power cord...