1MRK506375-UEN Rev. N
600/1 A
110 0,1kV
IEC16000124 V1 EN-US
Figure 158:
In order to monitor, supervise and calibrate the active and reactive power as indicated in figure
is necessary to do the following:
1.
Set correctly CT and VT data and phase angle reference channel PhaseAngleRef using
PCM600 for analog input channels
2.
Connect, in PCM600, measurement function to two-phase CT and VT inputs
3.
Set under General settings parameters for the Measurement function:
Table 37:
Setting
Operation
k
UGenZeroDb
IGenZeroDb
UBase (set in
Global base)
IBase (set in
Global base)
SBase (set in
Global base)
Table 38:
Setting
PMin
PMax
PZeroDb
Table continues on next page
Railway application RER670
Application manual
110kV Busbar
P
Q
110kV OHL
Single line diagram for 110kV OHL application
general settings as shown in table 37.
level supervision of active power as shown in table 38.
General settings parameters for the Measurement function
Short Description
Operation Off/On
Low pass filter coefficient for
power measurement, U and I
Zero point clamping in % of
Ubase
Zero point clamping in % of Ibase 3
Base setting for voltage level in
kV
Base setting for current level in A
Base setting for power level in
MVA
Settings parameters for level supervision
Short Description
Minimum value
Maximum value
Zero point clamping in 0.001% of
range
© 2017 - 2023 Hitachi Energy. All rights reserved
IED
IEC16000124-1-en.vsdx
Selected
Comments
value
On
Function must be On
0.00
Typically no additional filtering is required
25
Set minimum voltage level to 25%. Voltage below
25% will force S, P and Q to zero.
Set minimum current level to 3%. Current below
3% will force S, P and Q to zero.
110.00
Set rated OHL phase-to-phase voltage
600
Set rated primary CT current used for OHL
66
Set rated apparent two-phase power which
correspond to 110kV and 600A
Selected
Comments
value
-100
Minimum expected load
100
Maximum expected load
1000
Set zero point clamping to 0,66 MW that is, 1% of
66 MW