dallmeier IPS 2400 II Commissioning page 11

Table of Contents

Advertisement

IPS 2400 II
Documentation
The product documentation contains several documents which are
included in the scope of delivery in a printed form and/or on a digital
medium.
Read the documents included in the delivery carefully and thoroughly.
Always follow the contained instructions, notes and warnings and ob-
serve the technical specifications in the product data sheet.
Keep all documents in legible condition and in a suitable location for
future reference.
Regularly check the website www.dallmeier.com for the latest updates on
product documentation.
Condensation Water
If the device is brought from a cold to a warm environment, resulting con-
densation water may cause malfunctions and damages.
In this case, wait (up to 8 hours) until the device has reached room tem-
perature before commissioning.
Earthing & Equipotential Bonding
For the safety of persons (protection against dangerous contact voltages)
and devices (protection against over-voltages) as well as for the immunity
of information and communication technology equipment to electromag-
netic interferences (EMI), all protective measures, which are specified
by the currently valid DIN, VDE and ISO standards and which provide for
a standard-compliant earthing and a correct equipotential bonding of
electrical and electronic devices, are mandatory and must be fulfilled by
all means.
Lightning Storms
To avoid damage to the device by electrical surge during lightning storms,
all protective measures, which are specified by the currently valid DIN,
VDE and ISO standards and which provide for a standard-compliant
lightning protection equipotential bonding, are mandatory and must be
fulfilled by all means.
www.dallmeier.com
11

Advertisement

Table of Contents
loading

Table of Contents