Download Print this page

VTech Toot-Toot Drivers Construction Site Instruction Manual page 16

Hide thumbs Also See for Toot-Toot Drivers Construction Site:

Advertisement

E: Insert the Lift Cover to the Lift Wall, connect the SmartPoint™
Lift to the Lift Cover.
4. Assemble and attach the crane and tower components following the
steps as below:
A: Insert the Skip Bracket into the Two Tower Supports.
B: Insert the two High Supports into the Skip Bracket.
15

Advertisement

loading