Important - please read Contents of Packaging Please read these instructions carefully before starting installation and keep for future reference. Remove all packaging and check the product for missing parts or damage before Fixing Kit starting installation. Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
Installation Operation The spout can be swivelled to the required position. Hot control handle Cold control handle Hot inlet Seal Turning the handle clockwise will increase the water temperature. Cold inlet Rubber washer Rubber washer Before installing your new mixer, flush through the pipework to ensure removal of debris, turn off the water supply.
Cleaning instructions Notes The electroplating on this product is finished to the highest standard. Due care needs to be taken to ensure the appearance is retained. We recommend cleaning all products with a soft damp cloth ONLY and advise strongly against the use of all aggressive/corrosive cleaning products i.e.
Page 6
•The extended guarantee is only available if you have completed the Guarantee Registration Process. This can be done via the VADO website or via phone to our aftersales team. Registration must be completed within 6 months from date of purchase.