Bryant 880TA Installation, Start-Up, Operating And Service And Maintenance Instructions page 24

Variable-speed, induced-combustion 4-way multipoise gas furnace
Table of Contents

Advertisement

VOLTS---
FURNACE
HERTZ---
SIZE
PHASE
36045C17
115 ---60 ---1
36070C14
115 ---60 ---1
48070C17
115 ---60 ---1
60070C21
115 ---60 ---1
48090C17
115 ---60 ---1
60090C21
115 ---60 ---1
60110C21
115 ---60 ---1
66135C24
115 ---60 ---1
* Permissible limits of the voltage range at which the unit operates satisfactorily.
# Unit ampacity = 125 percent of largest operating component's full load amps plus 100 percent of all other potential operating components' (EAC, humidifier,
etc.) full load amps.
Time ---delay type is recommended.
{
Length shown is as measured 1 way along wire path between furnace and service panel for maximum 2 percent voltage drop.
}
WARNING
!
FIRE HAZARD
Failure to follow this warning could result in personal
injury, death, or property damage.
Do not connect aluminum wire between disconnect
switch and furnace. Use only copper wire.
Use a separate, fused branch electrical circuit with a properly
sized fuse or circuit breaker for this furnace. See Table 7 for wire
size and fuse specifications. A readily accessible means of
electrical disconnect must be located within sight of the furnace.
NOTE: Proper polarity must be maintained for 115- -v wiring. If
polarity is incorrect, control LED status indicator light will flash
rapidly and furnace will NOT operate.
J- -Box Relocation
NOTE: If factory location of J- -Box is acceptable, go to next
section (ELECTRICAL CONNECTION to J- -Box).
NOTE: On 14- -in. (356 mm) wide casing models, the J- -Box
shall not be relocated to other side of furnace casing when the
vent pipe is routed within the casing.
1. Remove and save two screws holding J- -Box. (See Fig.
23.)
NOTE: The J- -Box cover need not be removed from the J- -Box
in order to move the J- -Box. Do NOT remove green ground
screw inside J- -Box. (See Fig. 23.)
2. Cut wire tie on loop in furnace wires attached to J- -Box.
3. Move J- -Box to desired location.
4. Fasten J- -Box to casing with the two screws removed in
Step 1.
5. Route J- -Box wires within furnace away from sharp edges,
rotating parts and hot surfaces.
Table 7 – Electrical Data
OPERATING
MAX. UNIT
VOLTAGE RANGE*
AMPS
Max.
Min.
127
104
9.0
127
104
9.0
127
104
9.0
127
104
14.1
127
104
9.6
127
104
14.7
127
104
15.0
127
104
15.0
UNIT
MAX. WIRE
AMPACITY
LENGTH --- FT (M)}
#
12.0
30 (9.4)
12.0
30 (9.4)
13.0
28 (8.7)
18.4
31 (9.5)
12.63
29 (9.0)
19.0
30 (9.2)
19.3
29 (9.1)
19.3
29 (9.1)
Electrical Connection to J- -Box
Electrical Box on Furnace Casing Side (See Fig. 24.)
WARNING
!
FIRE OR ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal
injury, death, or property damage.
If field- -supplied manual disconnect switch is to be mounted
on furnace casing side, select a location where a drill or
fastener cannot damage electrical or gas components.
Factory
Factory
Installed
Installed
Fig. 23 - - Relocating J- -Box
1. Select and remove a hole knockout in the casing where the
electrical box is to be installed.
NOTE: Check that duct on side of furnace will not interfere with
installed electrical box.
2. Remove the desired electrical box hole knockout and posi-
tion the hole in the electrical box over the hole in the fur-
nace casing.
3. Fasten the electrical box to casing by driving two field- -
supplied screws from inside electrical box into casing
steel.
4. Remove and save two screws holding J- -Box. (See Fig.
23.)
24
MIN.
MAX. FUSE OR
WIRE
CKT BKR AMPS {
GAUGE
15
14
15
14
15
14
20
12
15
14
20
12
20
12
20
12
Alternate
Alternate
Location
Location
A10291

Advertisement

Table of Contents
loading