Disposal open flue of gas or other fuel-burning This product should not be disposed of with household appliances. waste. Please recycle where facilities exist. Check with your local authority for recycling advice. Integra Plus EC MVHR Installation & Commissioning...
As the stale air is extracted, a heat exchanger within the unit transfers up to 70% of the heat and transfers it into the supply air entering the bedrooms and lounge. Air Direction Intake from Outside Exhaust to Outside Extract from Rooms Supply to Rooms Integra Plus EC MVHR Installation & Commissioning...
Page 5
Product Description Exploded View of Fan Unit Cover Heat recovery cell Motor assemblies Base assembly Ø150 Integra Plus EC Dimensions Ø22 Integra Plus EC MVHR Installation & Commissioning...
Page 6
A wide range of sensors are available that can be used to switch the Integra Plus EC from normal to boost speed: 563519 TimeSpan 563506 Air Quality Sensor 563550 Ambient Response Humidity 563532 HumidiSwitch 563502 ThermoSwitch 455213 Normal Boost Switch 435960/446409 Vent Wise 459623 VisionX PIR Integra Plus EC MVHR Installation & Commissioning...
When taking delivery of the unit, check the items delivered against the enclosed delivery note. Inspect the unit for damage in transit. If in doubt, contact Customer Services. Each box contains a Integra Plus EC MVHR unit, Remote Boost Switch and an accessory pack containing condensate drain link pipes, clips, energy rating labels and product documentation.
Page 8
DOWNWARDS BY 3°- 5° TOWARDS THE CONDENSATE DRAIN) Fig 3c. Wall mounted CONDENSATION DRAIN (THE UNIT SHOULD SLOPE DOWNWARDS BY 3°- 5° TOWARDS THE CONDENSATE DRAIN) FOR FURTHER INFORMATION ON CONDENSATION WATER TRAP DETAIL, SEE FIG 4 Integra Plus EC MVHR Installation & Commissioning...
Page 9
Install suitable internal and external grilles/ terminals and connect them to the ventilation unit using suitable 150mm ducting. If flexible ducting is used, it should be stretched in order to obtain the best performance. Integra Plus EC MVHR Installation & Commissioning...
Switched Live 1 Black 220-240 V AC, 50 Hz input Switched Live 2 Black colour with white stripe 220-240 V AC, 50 Hz input Main power lead (2m) Remote boost lead (10m) Speed adjustment Integra Plus EC MVHR Installation & Commissioning...
Page 11
Note that the LS2 connection has a boost start time delay of 5 minutes. In the event that the unit is inadvertently left running on boost, it will revert to normal speed after 2 hours. Integra Plus EC MVHR Installation & Commissioning...
This prevents the recovery of heat from the extracted air stream by stopping the supply fan, thereby allowing the cooler outdoor air to enter the property via an open window or trickle vent. Integra Plus EC MVHR Installation & Commissioning...
Check the condensate drain tube is secure and clear of debris. Clean if necessary. Fastenings Check that all unit and wall-mount fastenings are sufficiently tight and have not become loose. Re-tighten if necessary. Integra Plus EC MVHR Installation & Commissioning...
Need help?
Do you have a question about the Integra Plus EC MVHR and is the answer not in the manual?
Questions and answers