Download Print this page

Siemens 3RB22 Equipment Manual page 36

Electronic overload relay
Hide thumbs Also See for 3RB22:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 27
Operation
5.5
Test
Testing
Dura-
phase
tion
1
3 s
2
3 s
3
18 s
4
1) Execute the configuration test to check the activated functions after a function expansion module has
been plugged in.
2) The flickering of the three red LEDs initiates the relay switch-off. Up to this moment, it is possible to
abort the user test without switching off the relays.
26
During testing, all protective functions remain activated. A tripping
operation/warning results in abortion of the test!
The test is started by pressing the TEST/RESET button for t > 1 s.
Description
LED test
1)
Configuration test
Internal tests
2)
Relay test
Comment
Check whether all LEDs are flashing
Activated functions are indicated by flickering
of the respective LEDs. The READY LED
stands for the autoreset function.
System executing internal tests.
During testing, the user can compare the
maximum motor current of the 3 phases with
the analog output current.
System opens the outputs 95/96 and 05/06
3ZX1012-0RB22-1AA1

Advertisement

loading

This manual is also suitable for:

3rb23