5.1 Installation condition and requirements Products installation Appendix 5.2 Tools and spare parts required for 10.1 Specification whole machine installation 10.2 ATESS Factory warranty 5.3 Mechanical installation 10.3 Contact 5.4 Electrical installation 5.5 Communication 5.6 Wiring for single/parallel system and CAN communication...
The operator should be fully familiar with this manual; 1.1 Contents The operator should be fully familiar with the local standards of the project. This manual applies to ATESS PBD250/350 Bidirectional battery controller, the manual contains: safety instruction 1.3. How to use this Manual Attention that needs to be paid when operating and maintaining ATESS PBD model.
DANGER indicates a hazard with a high level of risk which, if not DANGER indicates a hazard with a high level of risk which, if not transportation, mounting, wiring and commissioning. ATESS does not cover transportation, mounting, wiring and commissioning. ATESS does not cover avoided, will result in death or serious injury.
3.1 Energy Storage system emergency stop button and other parts. ATESS PBD250/350 is designed for solar charge controlling, The main function is to distribute the photovoltaic DC power to the energy storage battery. Now it is commonly used with our PCS energy storage system, as shown in the following system diagram: 3.2 Circuit diagram of the controller...
Page 6
3.3.2 internal component The internal components of PBD include:PV circuit breaker, battery circuit breaker, maintenance switch, load circuit breaker, power supply micro break, AC lightning protection switch, PCB, etc. Following is the structural drawing of pbd250 / 350 front and back side.
The following operation mode needs to cooperate with PCS energy storage PBD, and the output terminal of PBD250 / PBD350 should be connected to PCS for use. The mode selection needs to be made on PCS screen. The PBD350 system is equipped with a battery while pbd250 is not. When it charges the battery, the battery on PCS side will be charged first by default under all operating mode, then the PBD battery will be charged secondly;...
PBD is faulty. When PBD enters this permanent failure mode, please do not repair it the battery charge. without permission. You should contact the personnel of the local dealer or call Shenzhen Atess 2. Battery discharge automatically when PV power is lower than load power. when the battery is Power Technology Co., Ltd.
Customer Service department. Caution ATESS PBD can only be stored when it is sealed. Therefore make sure it’s dust and moisture-proof inside the machine. If storage time is long, PBD must be stored in a dry environment to prevent water from entering inside.
Note 1: The PBD is integrated and cannot be dissembled either in transportation or installation. Any fault attributed to modification unauthorized by ATESS is beyond our warranty liability. Ventilation environment...
Remove the screws, and the PBD will depart from the wood pallet. Battery The positive and negative highest voltage of the battery for PBD350 shall not exceed 800V, for PBD250 shall not exceed 850V, otherwise, the equipment will be in over-voltage protection state, and cannot work Movement and installation of bear machine normally.
Page 12
PBD250 get power supply from PV1. If there are less than 5 strings of PV modules connected, it has to be connected to PV1. The top fan of PBD250 needs AC-220v for power supply, and AC-220 needs to be connected to the Specific procedures are as follows: position of the relay below.
/ multiple PBD(s).Terminal blocks are used at both ends of RS485 communication line, by The following is the system CAN communication wiring diagram of single PBD connected to PCS. PBD250 paralleling the two blocks it will make RS485 line, which shall not exceed 1000m. In order to ensure dose not include battery, and the CAN-A on it control board does not need to be wired.
5.6.2 Wiring of paralle system and CAN communica tion The system wiring diagram of 4 parallel PBDs with 2 PCS is listed below. The output terminals of multiple PBDs are connected together and then connected to the battery terminal of PCS. Commissioning 6.1 Inspection before operation Before the PBD is put into operation, its installation shall be inspected.
Electrical inspection PBD is grounded completely and firmly. The grid voltage matches the rated output voltage of the PBD. Operationdata Historialdata systemsetting Poweron/off Home The phase sequence of grid connection is correct, and the tightening torque meets the requirements. The positive and negative poles of DC input connection are correct, and the tightening torque meets the Language Firstpage Generalfault...
Page 16
7.2.2 ON/OFF interface 7.2.4 System setting Clicking “ON/OFF” button in any interface will enter into this interface. Clicking “System setting” button in any interface will enter into this interface. There are “ON” and“OFF” button which is used to turn on and turn off the PBD. Submenu: language settings, time settings, PBD information, maintenance.Pressing the left button can enter Start up: turn the start knob to on and click "on"...
Page 17
Upper and lower limit of output voltage: if the output voltage is higher than the upper limit or Device Information: This page shows the manufacturer, PBD serial number, hardware and lower than the lower limit, a fault will be reported and the operation will be stopped. software version information, and the date of manufacturing, data in this page cannot be PV current upper limit, PV inductance current upper limit, output inductance current upper changed.
Page 18
24 o'clock must be divided into two settings. For example, 20:00-6:00 is the valley period, which needs to be set as 20:00-00:00, 00:00-6:00. The page without instructions is factory preset parameter, please do not modify. If the subsequent scheme changes, please modify the parameters under the guidance of ATESS.
Page 19
EEPROM_Read_Failure MainContactor_Failure SlaveContactor_Failure RISO_Failure The value on this page are important factory preset parameters. Please do not modify them without the consent of ATESS. PV1_VoltHigh_Fault PV2_VoltHigh_Fault PV1_CurrHigh_Fault The page without instructions is the factory preset parameter, please do not modif.
Page 20
OUT_OverCurr_Fault(INT) PV_L5_OverCurr_Fault PV_L3_OverCurr_Fault(INT) PV3_OverVolt_Fault(INT) PV_L4_OverCurr_Fault(INT) PV4_OverVolt_Fault(INT) PV_L5_OverCurr_Fault(INT) PV5_OverVolt_Fault(INT) OUT1_OCP_Fault PV3_OverCurr_Fault(INT) OUT2_OCP_Fault PV4_OverCurr_Fault(INT) PV1_BuckOCP_Fault PV5_OverCurr_Fault(INT) PV2_BuckOCP_Fault DC3_Thunder_Fault DC1_Thunder_Fault DC4_Thunder_Fault DC2_Thunder_Fault DC5_Thunder_Fault BAT_SoftStart_Fault OUT_SoftStart_Fault PV_Module_OverTemp_Fault 7.3.1 troublesho oting methods and steps OUT_Module_OverTemp_Fault PV_Inductor_OverTemp_Fault The troubleshooting steps are as follows: OUT_Inductor2_OverTemp_Fault 1. Observe the screen fault record information. LowTemp_Fault 2.
Operation 8.3 Power off steps 8.1 Power on steps CAUTION! After installation and system settings are inspected, inverter can be started for operation. After the PBD is completely powered off, the machine is still electrified. If operations are First run needed, please be sure to cut off the outer power completely, and wait for not less than 5 The first operation steps are as follows: minutes.
In order to ensure the normal operation of the PBD, regular maintenance work is required. Maintenance and modification Recommended routine maintenance cycle and work, as shown in Table 7-2. Only personnel authorized by ATESS can maintain and modify the PBD. To ensure personal safety, please Cycle Maintenance item use only the original components provided by the manufacturer.
Warranty conditions Input(PV) In the event of failure during the warranty period, ATESS will repair or replace the product free of charge; Recommended PV power(KW) The failed machine shall be owned by ATESS; the customer shall Set aside some time to repair the faulty 450~900 MPPT voltage range(V)...