Vent Pipe Assembly; Venting - A.O. Smith 110 Series Instruction Manual

Commercial gas water heaters
Hide thumbs Also See for 110 Series:
Table of Contents

Advertisement

Never use this water heater unless it is completely full of water. To
prevent damage to the tank, the tank must be filled with water. Water
must flow from the hot water faucet before turning "ON" gas to the
water heater.
To fill the water heater with water:
1. Close the water heater drain valve by turning handle to the right
(clockwise). The drain valve is on the lower front of water heater.
2. Open the cold water supply valve to the water heater.
NOTE: The cold water supply valve must be left open when the
water heater is in use.
3. To insure complete filling of the tank, allow air to exit by opening nearest
hot water faucet. Allow water to run until a constant flow is obtained.
This will let air out of the water heater and the piping.
4. Check all water piping and connections for leaks. Repair as needed.

VENT PIPE ASSEMBLY

There are three parts of the vent pipe assembly that connect the water
heater exhaust (located on lower back side of water heater) to inlet of the
blower assembly (mounted on top of water heater) as shown in Figure
1. These parts will need to be assembled according to these instructions.
Assemble Vent Pipe Assemblies #1, #2 and #3 (See Figure 1) prior
to cementing. The preferred orientation of Vent Pipe Assembly #1
(Condensate U-Assembly) is shown in Figure 16. However this
assembly may be rotated to a different orientation as needed for the
specific installation requirements. Note the rotational orientation of
each part by marking a line several inches long across the joints.The
long tube of Vent Pipe Assembly #2 should be approximately vertical.
If it is found that either of the two pieces of pipe in Vent Pipe Assembly
#2 are too long for proper fit-up, then remove as little material as
possible to improve the fit-up. Keep in mind that the pipes will insert
slightly further into the elbows when cement is applied as it acts
as a lubricating agent. The vertical distance from the bottom of the
Condensate U-Assembly to the floor that supports the water heater
should be approximately 0.25" (0.64 cm), see Figure 16. Disassemble
the parts and cement back together using the alignment marks. After
the cement dries, attach the assembly to the blower and the water
heater exhaust using the supplied rubber boots and hose clamps.
A condensate trap is incorporated in the bottom of this vent pipe assembly.
See the CONDENSATE section of this manual for further details.

VENTING

Breathing Hazard - Carbon Monoxide Gas
Install vent system in accordance with codes.
Do not operate water heater if exposed to flooding
or water damage.
High altitude models should be installed at
elevations above 5,300 feet (1,615 m). For
operation above 10,100 feet (3,079 m), a high
altitude orifice must be installed.
Do not operate if soot buildup.
Do not obstruct water heater air intake with
insulating jacket.
Do not place chemical vapor emitting products
near water heater.
Gas and carbon monoxide detectors are available.
Never operate the heater unless it is vented to the
outdoors and has adequate air supply to avoid risks
of improper operation, fire, explosion or asphyxiation.
Analyze the entire vent system to make sure that
condensate will not become trapped in a section of
vent pipe and therefore reduce the open cross
sectional area of the vent.
Breathing carbon monoxide can cause brain damage or
death. Always read and understand instruction manual.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Btx-80

Table of Contents