Lennox 95G2UHV Installation Instructions Manual page 53

Warm air gas furnace upflow/horizontal left air discharge direct vent & non-direct vent
Table of Contents

Advertisement

Turning Off Gas to Unit
1.
Set the thermostat to the lowest setting.
2.
Turn off all electrical power to the unit if service is to
be performed.
3.
Remove the upper access panel.
4.
Move gas valve switch to OFF.
5.
Replace the upper access panel.
Failure to Operate
If the unit fails to operate, check the following:
1.
Is the thermostat calling for heat?
2.
Are access panels securely in place?
3.
Is the main disconnect switch closed?
4.
Is there a blown fuse or tripped breaker?
5.
Is the filter dirty or plugged? Dirty or plugged filters will
cause the limit control to shut the unit off.
6.
Is gas turned on at the meter?
7.
Is the manual main shut–off valve open?
8.
Is the internal manual shut–off valve open?
9.
Is the unit ignition system in lockout? If the unit locks
out again, inspect the unit for blockages.
Heating Sequence of Operation
1.
When thermostat calls for heat, combustion air inducer
starts.
2.
Combustion air pressure switch proves blower
operation. Switch is factory set and requires no
adjustment.
3.
After a 15 second pre-purge, the hot surface ignitor
energizes.
4.
After a 20 second ignitor warm-up period, the gas
valve solenoid opens.
5.
Gas is ignited, flame sensor proves the flame, and the
combustion process continues.
6.
If flame is not detected after first ignition trial, the
ignition control will repeat steps 3 and 4 four more
times before locking out the gas valve. The ignition
Capacity
045
070
090
110
135
*Conversion requires installation of a gas valve manifold spring which is provided with the gas conversion kit.
Pressure switch is factory set. No adjustment necessary. All models use the factory-installed pressure switch from 0-4500 feet (0-1371 m).
Table 16. Conversion Kit Fan Pressure Switch Requirements at Varying Altitudes
507266-05
Natural to LP/
High Altitude Natural
Propane
Burner Orifice Kit
0 - 7500 ft
7501 - 10000 ft
(0 - 2286m)
(2286 - 3048m)
11K48
*51W01
control will then automatically repeat steps 1 through
6 after 60 minutes. To interrupt the 60 minute period,
move thermostat from "Heat" to "OFF" then back to
"Heat". Heating sequence then restarts at step 1.
Gas Pressure Adjustment
Gas Flow (Approximate)
Capacity
1 cu ft
Dial
-045
80
-70
55
-90
41
-110
33
-135
27
Natural - 1000 btu/cu ft
Table 15. Gas Meter Clocking Chart
Furnace should operate at least 5 minutes before checking
gas flow. Determine time in seconds for two revolutions of
gas through the meter. (Two revolutions assures a more
accurate time.) Divide by two and compare to time in Table
15. If manifold pressure matches Table 14 and rate is
incorrect, check gas orifices for proper size and restriction.
Remove temporary gas meter if installed.
NOTE: To obtain accurate reading, shut off all other gas
appliances connected to meter.
Supply Pressure Measurement
An inlet pressure post on the inlet side of the gas valve
provides access to the supply pressure. See Figure 74.
Back out the 3/32 Hex screw one turn, connect a piece
of 5/16" tubing and connect to a manometer to measure
supply pressure.
NOTE: Shut unit off and remove manometer as soon as
an accurate reading has been obtained. Take care to re-
tighten the 3/32 Hex screw.
High Altitude LP/
Propane Burner
Orifice Kit
7501 - 10000 ft
(2286 - 3048m)
11K47
Issue 1933
Seconds for One Revolution
Natural
2 cu ft
1 cu ft
Dial
Dial
160
200
110
136
82
102
66
82
54
68
LP - 2500 btu/cu ft
High Altitude Pressure Switch
4501 - 7500 ft
7501 - 10000 ft
(1371 - 2286m)
(2286 - 3048m)
14A47
14A54
14A57
14A46
14A49
LP
2 cu ft
Dial
400
272
204
164
136
14A50
14A53
14A54
14A51
14A51
Page 53 of 58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents