Download Print this page

Marco 5001862US Quick Start Manual page 2

Advertisement

FRIIA C, FRIIA CS & FRIIA C HANDS - FREE
FRIIA COLD, FRIIA COLD/SPARKLING & FRIIA COLD HANDS - FREE
COUNTER CUT - OUT WITH DRIP TRAY
1.25"/32mm
4"/100mm
For drip-tray only
Cold / Sparkling
Power
VENTILATION REQUIREMENTS
FRONT VENTILATION: Ventilation grilles cut out of standard cabinet door.
SIDE VENTILATION: Ventilation grilles cut out of standard 600mm
cabinet. Grilles may be fitted on either side as long as they ventilate
into an open unobstructed area.
BASE VENTILATION: Ventilation grilles cut in base panel and base
plinth, a grille must also be cut out at the top of the cabinet.
• At least 2 x vents 260mm/10.2" w x 65mm/2.5 h
• The cabinet may be ventilated in many ways provided there are cut
outs placed near the base and another near the top of the cabinet
to take advantage of natural circulation.
UNPACKING INSTRUCTIONS
• The chiller must be handled only in a vertical position. Transporting
the appliance in a horizontal position can cause severe damage to
the refrigerator.
• Remove the exterior and interior packing. Packing materials
(especially any plastic bags) should be stored out of the reach
of children, as a potential source of danger. When disposing
packaging parts, please follow current regulations on the matter,
separating carton from plastic parts.
• Always check that the equipment that is delivered corresponds to
the model indicated in the accompanying document.
• The equipment is shipped in a cardboard box. Once the packaging
has been removed, check the equipment has not been damaged in
transit; if damage is found, notify the carrier.
ELECTRICAL INSTALLATION PROCEDURE
When installing the machine, always observe the local regulations and
standards. The appliance is supplied with a moulded power cord. A
suitable mains power supply socket should be available within easy
access of the appliance so that it can be disconnected easily after install.
The standard machines are supplied with a UK 3-pin plug. For
EU models a 2-pin CEE-7 plug will be supplied. US models will be
supplied with the suitable plug. A suitable mains power supply socket
should be available within easy access of the appliance so that it
can be disconnected easily after install. The wires from the font are
terminated in a Mini Fit connector which will plug into a similar Mini Fit
connector mounted on the top lid of the undercounter boiler.
For more information visit www.marcobeveragesystems.com
FRIIA C
5001860US
FRIIA C Tall
FRIIA C Hands-Free
1400820
2301251
Cold/Sparkling
Water
1401482
PLUMBING INSTALLATION PROCEDURE
100 min.
• Ensure that the equipment is installed according to local plumbing
& water regulations.
• Fit a stop valve on a cold water line and attach a 3/4" BSP male
fitting, (eg. 3/4" x 1/2" 311 or washing machine type stop valve).
Suitable fittings are supplied with the kit to attach to 3/8"
Compression or 3/8" John Guest.
• Connect water supply lines following the installation drawings,
as per installation guide.
• In case filter systems are used verify that they satisfy the
requirements of the legislation in force.
• If the filter is new, turn on water and flush at least 10 liters
(2.5 gallon) through the filter before to connect it to the cooler;
if the filter is a used one, connect water inlet to the chiller.
Applies to model(s) 1000850# & 1000851# (where # is blank, or one or more alphanumeric characters)
• To ensure that the maximum value of pressure of 3 Bar is not
PANEL REMOVAL
DESCRIPTION:
exceeded the chiller integrates a pressure reducer.
• Turn on the water to flush any impurities, dust etc from the inlet hose and
water pipe. Allow several litres through. Especially for new installations.
OPERATING THE CHILLER/CARBONATOR FOR THE
FIRST TIME
• Before connecting the appliance to the power source, let it stand upright
for approximately 2 hours. This will reduce the possibility of a malfunction.
• Check that all installation procedures have been carried out.
• Ensure water inlet is open.
• Before supplying power to the unit check water and Carbon Dioxide
lines do not leak.
• Plug the chiller into a suitable socket switch ON/OFF switch on the rear
of the chiller to ON position. The "Power ON Status" light will light-up.
• When the unit is on, the carbonation pump starts to fill. The
carbonation device stops when it reaches the maximum level.
• Once water and CO2 are connected, open the vent on top of the
Chiller by pulling the ring. This operation allows the escape of any air
bubbles present inside, which would affect the carbonation adversely.
• On the pressure reducer knob, adjust CO2 pressure to a value
between 50 and 65 PSI (350 and 450 kPa) (3.5 - 4.5 bar). This value
depends on the temperature of the water and on the ambient
temperature. The temperatures correspond to the CO2 pressure.
• To enable filling the lines, open the two lines in the following order:
cold sparkling water and cold natural water, until the flows appear
regular and without the presence of air, in each case deliver and
discharge at least 5 litres of water from each line.
• At this point you can dispense water.
FRIIA CS
5001863US
FRIIA CS Tall
5001857US - C
12"(Hands-free)
13.5"/345mm
11.4" (Cold/Sparkling)
(Tall)
10.2"/259mm
600
FRIIA Assembly (in cabinet)
DWG NO.:
5001862US
5001865US
200
PJT 20-08-14
C.O.
187
DRAWN BY

Advertisement

loading

This manual is also suitable for:

Friia c tallFriia c hands-freeFriia csFriia cs tall5001860us5001863us ... Show all