Summary of Contents for Gram ICS Pacific Pharma 1000 GD
Page 1
ICS PACIFIC Pharma 3000 Medical Includes Door left open alarm USER MANUAL Version two Pharma 3000 SD Pharma 1000 GD Pharma 3000 GD Manufactured in Denmark by Gram Commercial A/S specifically to ICS PACIFIC, Strive for 5 and QCPP requirements...
Installation Stocking with vaccines Strive for 5 / QCPP accreditation / Temperature Data Logging Connection to electricity Operating instructions Reading and resetting High/Low Temperatures Alarm function Fitting an external alarm Maintenance Cleaning Spare parts Servicing Disposal www.icspacific.com.au info@icspacific.com.au Phone 1800 630 360 765041962-2...
Page 3
Installation The cabinet must only be used indoors and be placed in an area that is dry and well ventilated. It must not be positioned in direct or indirect sunlight, near warm appliances or locations with drafts. The cabinet is designed to perform in an ambient temperature of between +10°C (minimum) and +32°C (maximum) and a maximum ambient humidity of 60%.
Page 4
Fig 1: Freestanding or against a wall Fig 2: Built in Side by Side: If cabinets are placed side by side, the minimum distance between the cabinets of 30 mm shown below is required due to the risk of condensation between the cabinets. Min.
Page 5
Anti-topple brackets must be installed to avoid any possibility of the cabinet toppling over when the door is opened. The brackets which are delivered with the cabinet must be fastened to the wall behind the cabinet as shown in the drawings.
Stocking with Vaccines The base shelf (shown below) must be placed on the bottom of the cabinet to ensure good ventilation. Stocking the cabinet: When using containers such as boxes or trays on the shelves ensure there is adequate ventilation in the bottom of the containers and around the containers so that the air flow is not restricted.
Connection to Electricity The cabinet is designed for connection to 230-240/50/1 alternating current (AC) only. Power connection must be a 3-pin plug inserted into a 10 Amp power point. The plug and power point must have the correct earth connection. If in any doubt contact the cabinet supplier or authorized electrician.
Operating instructions The cabinet is pre-set to operate at +5ºC within a temperature range of +2ºC to +8ºC in accordance with Strive for 5 Quality Care Pharmacy Program (QCPP) Cold Chain Standards. To operate simply insert the 3-pin plug and switch on the cabinet at the mains. Before stocking the cabinet wait 15 to 30 minutes until the temperature shows 05 ºC.
Alarm function The alarm will activate and the diplay will flash if: The temperature inside the cabinet goes below +2ºC or rises above +8ºC for longer than 30 minutes. The self-closing door has been left open for longer than 3 minutes Also refer to "lnstallation"...
Maintenance Before maintenance switch off the cabinet at the mains and remove the 3-pin plug from the wall. The cabinet should be maintained regularly. Ensure the grill on the back of the cabinet is kept clean of dust and dirt. Use ONLY a soft brush or vacuum cleaner to gently remove any dust or dirt build up that may occur.
Page 12
To order, or for more information, please contact; MEDICAL EQUIPMENT SPECIALISTS DocStock Pty Ltd ABN 48 115 268 203 P: (02) 8850 7177 E: info@docstock.com.au www.DocStock.com.au www.icspacific.com.au info@icspacific.com.au Phone 1800 630 360...