Download Print this page

ZUCCHETTI Z95340 Instruction For The Installation

Advertisement

Quick Links

PLACCA PER CASSETTE
I
GB
F
D
E
RU
PL
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it
DI SCARICO
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
INSTRUKCJE INSTALACJI ARMATURY
Zucchetti Rubinetteria S.p.A.
Z95340

Advertisement

loading

Summary of Contents for ZUCCHETTI Z95340

  • Page 1 INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ INSTRUKCJE INSTALACJI ARMATURY Z95340 Zucchetti Rubinetteria S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it...
  • Page 2 Z95340 INSTALLAZIONE / INSTALLATION SE NECESSARIO IF NECESSARY PIASTRELLA / PIASTRELLA / TILE TILE MAGNETE / MAGNET...
  • Page 3 Z95340 INSTALLAZIONE / INSTALLATION MANUTENZIONE / MAINTENANCE...
  • Page 4 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.