Download Print this page

Huawei PDU8000 Quick Manual page 7

Modular precision pdc v2.0
Hide thumbs Also See for PDU8000:

Advertisement

4. Connect the input power cables.
1. In single-input scenarios, connect the input N
cable to 1N.
2. Connect the three-phase cables, N cable, and
PE cable in turn.
6. The following figure shows the overall
effect after cable connection.
5. Connect the output power cables.
7. Connect the PDC monitoring cable to the
RS485_1 or FE port on the MDU side panel.
(1) Monitoring cable outlet
8. (Optional) Connect the fire linkage cable
by referring to Appendix B.
9. Cut suitable holes in the rodent-proof
meshes and reinstall the rodent-proof
meshes.
10.Reinstall the transparent covers of the
input copper bar and N bar.
11.Seal the gap between cables and the
cabinet using flake sealing putty. (Remove
the paper protective film from the sealing
putty and use the aluminum foil film
together with the sealing putty.)
7

Advertisement

loading