NuTone ROOMSIDE AERN110SLW Installation And Use & Care Instructions page 7

Decorative fan-light
Table of Contents

Advertisement

Available languages

Available languages

7. Connect wiring.
Connect power cable to housing with appropriate UL
approved connector. Make wiring connections as shown
in "Wiring Diagrams" section. Re-install wiring panel and
secure with screw from parts bag.
CAUTION
• DO NOT TOUCH THE HUMIDITY-
SENSING CIRCUIT BOARD.
Electrostatic discharge may damage
the circuit board.
8. Mount fan to ceiling structure.
Mount housing to ceiling structure with standard
drywall or wood screws in locations shown.
*
Center hole optional.
9. Connect 4-in. round duct.
Pull existing ducting through housing discharge
opening.
Attach and tape ducting to duct connector.
Push connector/ducting back through opening.
Engage tabs and secure with screw from parts
bag.
3
2
4
Install blower. Finish ceiling, then
install grille.
See Steps 9 & 10 on Page 6.
1
TABS
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents