product before you carry out the gas leak-
tightness test.
If, during gas leak-tightness tests, you
have closed the gas stopcock that is in-
stalled upstream of the product, relieve
the gas line pressure before you open this
gas stopcock.
Do not reduce the gas pipe dimension downstream of the
gas meter.
Maintain the dimension right up to the product.
Select the correct gas stopcock.
Remove the residues from the gas pipe by blowing
through the gas pipe beforehand.
A
1
Undo the press connection (A).
Install an approved gas stopcock at the connection (1).
Install the unit on the gas pipe at the product's outlet (B)
by tightening the compression fitting (C).
Install the gas pipe such that it is free from mechanical
stress in accordance with the recognised rules of techno-
logy.
Purge the gas pipe before start-up.
5.5.2
Checking the gas line for leak-tightness
Check the entire gas line properly for leak-tightness.
5.5.3
Hydraulic connection
Caution.
Risk of material damage caused by corro-
sion
Due to non-diffusion-tight plastic pipes in the
heating installation, air gets into the heating
water. Air in the heating water causes corro-
sion in the heat generator circuit and in the
product.
If you use non-diffusion-tight plastic pipes
in the heating installation, ensure that no
air gets into the heat generator circuit.
0020261188_00 ecoTEC plus Installation and maintenance instructions
5.5.3.1 Connecting the heating flow and heating
C
B
1.
2.
3.
Note
In order to keep heat losses to a minimum, we
recommend that you provide heat insulation for
the water pipe spigots on the product's outlet and
on the installation.
If you are using plastic pipes in the heating installation,
install a safety cut-out in the heating flow.
The safety cut-out is required to protect the heating
installation against temperature-related damage if a
fault occurs.
Connect a control or a safety cut-out to the electronics.
(→ Page 18)
return
B
A
Attach the nut to the connection in accordance with
steps (A) to (D).
4
3
2
1
12
11
10
9
Assemble the heating return connection as shown by
numbers (1) to (6).
Assemble the heating flow connection as shown by
numbers (7) to (12).
Installation 5