UTS 1450/850 250 AGR
Instruction Manual
Mobile Access Tower
AGR—Advanced Guardrail System
UTS SALES & REPAIRS LTD
Manufactured to: BSEN1004-1:2020 CLASS 3 8/8 XXXD H2
Instruction Manual EN 1004-2 en
UTS SALES & REPAIRS LTD
www.towersandpodiums.co.uk
info@towersandpodiums.co.uk
Instruction Manual
This Assembly Guide is intended to provide you
with step-by-step instructions on how to erect your
Mobile Access Tower (MAT) with ease and safety,
using the AGR (Advanced Guardrail System)
method.
You should read and understand all notes and
diagrams, including the parts list for each height,
before commencing assembly. Personnel should
be qualified or competent to erect this tower.
Please consult the PASMA's code of practice for
full information on the use of Mobile Access
Towers.
Remember to do a risk assessment of the area
where the tower is to be used before commencing
erection.
This instruction manual shall be available on the
location of use of the mobile access and working
tower.
This mobile access and working tower shall only be
used according to this manual without any
modification.
Mobile access and working towers must only be
used in accordance with national regulations.
Need help?
Do you have a question about the 1450/850 250 AGR and is the answer not in the manual?
Questions and answers