nifty TrackDrive TD34T Series Operating/Safety Instructions Manual page 27

Hide thumbs Also See for TrackDrive TD34T Series:
Table of Contents

Advertisement

Minimum width – Selector in line.
Minimum width – Track in.
4.1.6
OUTRIGGERS
The four outriggers are deployed using the individual levers behind the main turret. Each lever controls
the movement of an outrigger leg, their relative positions being indicated by the lever spacing. The left
hand lever controls the left rear jack, the next the left front, then the right front and lastly the right rear.
To allow the outrigger circuit to generate flow to the individual legs, the hydraulic selector valve is
gripped and held. This diverts flow to the outrigger circuit and at the same time energises the
boom/jack dump valve. If high throttle is selected, the engine will go to high revs, allowing the four
outriggers to be deployed in the best possible time. As the feet reach the end of travel, the high throttle
control can be turned 'off' allowing fine positioning of each leg and assisting in the levelling process.
The machine should be levelled using the indicator mounted on the machine base, clearly visible
between the outrigger controls and the platform edge. If necessary, each jack foot should have a
spreader plate inserted beneath it to spread the foot load and prevent sinking. The machine must be
set up level before the booms are elevated, on firm ground or with the working area adequately
consolidated.
FAILURE TO DEPLOY THE OUTRIGGERS CORRECTLY COULD RESULT
IN DEATH OR SERIOUS INJURY.
English/USA – 01/10
*Always follow manufacturer instructions*
*AAA Rent-All 225-291-1356*
TrackDrive (TD) Series
Operating & Safety Instructions
Maximum width – Selector sideways.
Maximum width – Track extended.
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trackdrive td120t series

Table of Contents