Download Print this page

Sealey PCB32 Instructions page 3

Professional conduit bender

Advertisement

5.2.3. Place a square or a rule against the mark on the conduit and slide the conduit along until the square touches the outside edge of the
former (9) (fig.4.A). The conduit is now in the correct position for bending.
Note! Before commencing the bend ensure that the conduit is bedded firmly into the groove in the former (9) otherwise the
bend will be inaccurate.
5.3. Bending to inside measurements.
5.3.1. Measure from the end of the conduit to the distance required and mark accordingly.
5.3.2. Insert the measured part of the conduit into the conduit bender so that it rests against the stop piece (5) and beds into the groove of the
former (9).
5.3.3. Place a square or a rule against the mark on the conduit and slide the conduit along until the square touches the inside edge of the
former (9) (fig.4.B). The conduit is now in the correct position for bending.
5.4. Measuring from a bend.
Note! Use the method explained above to make a bend at a given distance from another bend whether in the same or a different
plane.
5.4.1. If the required measurement is from the outside to the outside of the bends, mark off from the outside of the first bend and square up
with the outside (fig.4.A) of the former (9). If the measurement is from the outside to the inside of the bends (centre to centre) square up
with the inside of the former (fig 4.B).
5.5. Making offsets.
5.5.1. Make the first bend to the required angle. As a guide this should be 45° for offsets measuring 100mm or more and progressively less as
the offset decreases.
5.5.2. Place the bend in the machine as shown in fig.5. Place a straight edge against the outer edge of the former (9) and parallel to the bend.
Adjust the conduit in the machine until the required measurement is obtained.
Note! The offset will increase as the conduit is pushed to the right and decrease as the conduit is pushed to the left.
5.5.3. When the conduit is set correctly ensure that it is firmly bedded into the former. Bend in the normal way until the bends are parallel to each
other.
6. MAINTENANCE
6.1. Check for damage and missing parts before use.
6.2. Regularly oil all moving parts.
6.3. After use store in a safe, dry, childproof location.
4. OPERATION
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR
01284 757500
© Jack Sealey Limited
fig.4
01284 703534
sales@sealey.co.uk
Original Language Version
fig.5
www.sealey.co.uk
PCB25
Issue:1 - 31/10/17

Advertisement

loading