Wachs TRAV-L-VAC 300 Manual

Transportable vacuum system

Advertisement

Quick Links

TRAV-L-VAC 300
TRANSPORTABLE
VACUUM SYSTEM
MODEL TLV 300
MAINTENANCE EQUIPMENT
Model TLV 300
E.H. WACHS COMPANIES
E.H. Wachs Company
100 Shepard St. Wheeling Il. 60090
600 Knightsbridge Pkwy., Lincolnshire, IL 60069
Part Number:
Revision No:
i
PIPE & VALVE
Ser.No.
Patent Pending
59-MAN-01
0
REV: 21
JAN. 2003

Advertisement

Table of Contents
loading

Summary of Contents for Wachs TRAV-L-VAC 300

  • Page 1 TRAV-L-VAC 300 TRANSPORTABLE VACUUM SYSTEM MODEL TLV 300 PIPE & VALVE MAINTENANCE EQUIPMENT Model TLV 300 Ser.No. E.H. WACHS COMPANIES E.H. Wachs Company 100 Shepard St. Wheeling Il. 60090 600 Knightsbridge Pkwy., Lincolnshire, IL 60069 Patent Pending Part Number: 59-MAN-01...
  • Page 3: Table Of Contents

    WACHS TRAV-L-VAC 300 TABLE OF CONTENTS INTRODUCTION Standard & optional features ................. 4 Specifications ......................4 III. Safety ........................5 IV. Installation procedures ..................6 SET UP & OPERATING PROCEDURES Before departure to jobsite ..................7 Trav-L-Vac set up procedure .................. 7 III.
  • Page 4: Introduction

    • Gasoline drive. filtration system and suction tube. • 2-1/2" (63.5 mm) diameter x 10' (3.0 m) flexible wire reinforced The TRAV-L-VAC 300, the smallest member of the TRAV-L- rubber suction hose. VAC line, features strong lifting capability and the largest •...
  • Page 5: Safety

    SAFETY INSTRUCTIONS SECTION III The E. H. Wachs Company takes great pride in manufacturing safe, quality products with user safety a priority.The E.H. Wachs Company recommends that all users comply with the following safety rules and instructions when operating our equipment. For your safety and the safety of others, read and understand these safety recommendations and operating instructions before operating.
  • Page 7: Set Up & Operating Procedures

    WACHS TRAV-L-VAC 300 SECTION IV SET-UP OPERATING PROCEDURES...
  • Page 8 WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV TRAILER PACKAGE ASSEMBLY: NOTE: REFER TO INSTALLATION DIAGRAM 12.Pull the green and brown wires up through the conduit directly 1.Bolt fender braces (076) to dump gate sides by using 3/8-16 x 3/4 above the exit hole.
  • Page 9 WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV INSTALLATION DIAGRAM...
  • Page 10: Trav-L-Vac Set Up Procedure

    2. Ensure vacuum diverter valve is closed to achieve proper suction through the suction hose. If diverter valve is open TRAV-L-VAC 300 SET UP PROCEDURE: no suction will be present at the wand opening. 1. Position TLV system near work area.
  • Page 11 WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV extract debris until valve box is empty or until holding 2. Position vacuum system over designated dumping area. tank is full. (Fig. 3) 5. If the unit fills with liquid to its limit, the high liquid level 3.
  • Page 12: Operating Tips

    WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV 1. Shut down engine. 2. Position vacuum system over designated dumping area. 3. If the material collected is primarily solid, first open the holding tank drain plug to allow any trapped liquids to escape.
  • Page 13: Maintenance

    WACHS TRAV-L-VAC 300 SECTION V MAINTENANCE...
  • Page 14 WACHS TRAV-L-VAC 300 MAINTENANCE BLOWER MAINTENANCE SCHEDULE WEEKLY CHECK OIL LEVEL: Stop blower. Wait 5 minutes. Remove oil breather and oil level plug. Add oil until oil runs out level holes. Re- place breather and level plugs. GREASE BEARINGS: Grease drive end bearings with NLGI grade 2 EP grease in a pressure gun.
  • Page 15 WACHS TRAV-L-VAC 300 GENERAL MAINTENANCE SCHEDULE DAILY Check suction hoses for any abrasions, holes, kinks or damaged connectors. Replace as needed. Verify that all dump gate and filter lid camps are se- cured tight. Adjust if necessary. Clean any debris from dump door seal.
  • Page 16: Charts And Graphs

    WACHS TRAV-L-VAC 300 SECTION V MISCELLANEOUS CHARTS GRAPHS...
  • Page 17 WACHS TRAV-L-VAC 300 TRAV-L-VAC 300 ACOUSTIC EVALUATION SOUND DECIBLE LEVEL DIAGRAM @ 10 FT...
  • Page 18 WACHS TRAV-L-VAC 300 TRAV-L-VAC 300PERFORMANCE CHARTS...
  • Page 19 WACHS TRAV-L-VAC 300 BILL OF MATERIAL...
  • Page 20 WACHS TRAV-L-VAC 300 TRAV-L-VAC 300 BILL OF MATERIAL PART NO. 59-000-01 & 59-401-01 REF. PART NO. QTY. DESCRIPTION REF. PART NO. QTY. DESCRIPTION 59-300-01 TLV FRAME 59-079-00 HOSE CLAMP 1/2" 59-302-01 BLOWER W/ SILENCER *057 62-091-00 SHUT DOWN DECAL 59-033-01...
  • Page 21 WACHS TRAV-L-VAC 300...
  • Page 22 WACHS TRAV-L-VAC 300 TRAV-L-VAC 300 GASOLINE BILL OF MATERIAL PART NO. 59-000-01 & 59-401-01 ( CONT. ) REF. PART NO. QTY. DESCRIPTION 90-071-07 3/8-16 x 3/4" HHCS 90-075-53 3/8" FLAT WASHERS 90-075-55 3/8" LOCK WASHERS 90-075-01 3/8-16 HEX NUTS 90-075-05...
  • Page 23 WACHS TRAV-L-VAC 300 TRAV-L-VAC 300 BLOWER ASSEMBLY PART NO. 59-302-01 REF. PART NO. QTY. DESCRIPTION 029 59-029-00 NIPPLE, 2-1/2" x 4-1/2" 030 59-030-00 NIPPLE, 2-1/2" x 3-1/2" 031 59-031-00 NIPPLE, 2-1/2" x 7" 032 59-032-00 NIPPLE, 2" x CLOSE 050 62-050-00...
  • Page 24: Ordering Information

    WACHS TRAV-L-VAC 300 ORDERING INFORMATION To place an order or to get more detailed information on any E. H. Wachs product, call us at: 1- (800) - 323 - 8185 In the U.S.A. 1- (847) - 537 - 8800 Worldwide ORDERING REPLACEMENT PARTS Please use parts lists provided in manual.