WACHS TRAV-L-VAC 300 TABLE OF CONTENTS INTRODUCTION Standard & optional features ................. 4 Specifications ......................4 III. Safety ........................5 IV. Installation procedures ..................6 SET UP & OPERATING PROCEDURES Before departure to jobsite ..................7 Trav-L-Vac set up procedure .................. 7 III.
• Gasoline drive. filtration system and suction tube. • 2-1/2" (63.5 mm) diameter x 10' (3.0 m) flexible wire reinforced The TRAV-L-VAC 300, the smallest member of the TRAV-L- rubber suction hose. VAC line, features strong lifting capability and the largest •...
SAFETY INSTRUCTIONS SECTION III The E. H. Wachs Company takes great pride in manufacturing safe, quality products with user safety a priority.The E.H. Wachs Company recommends that all users comply with the following safety rules and instructions when operating our equipment. For your safety and the safety of others, read and understand these safety recommendations and operating instructions before operating.
WACHS TRAV-L-VAC 300 SECTION IV SET-UP OPERATING PROCEDURES...
Page 8
WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV TRAILER PACKAGE ASSEMBLY: NOTE: REFER TO INSTALLATION DIAGRAM 12.Pull the green and brown wires up through the conduit directly 1.Bolt fender braces (076) to dump gate sides by using 3/8-16 x 3/4 above the exit hole.
Page 9
WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV INSTALLATION DIAGRAM...
2. Ensure vacuum diverter valve is closed to achieve proper suction through the suction hose. If diverter valve is open TRAV-L-VAC 300 SET UP PROCEDURE: no suction will be present at the wand opening. 1. Position TLV system near work area.
Page 11
WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV extract debris until valve box is empty or until holding 2. Position vacuum system over designated dumping area. tank is full. (Fig. 3) 5. If the unit fills with liquid to its limit, the high liquid level 3.
WACHS TRAV-L-VAC 300 SET-UP AND OPERATION SECTION IV 1. Shut down engine. 2. Position vacuum system over designated dumping area. 3. If the material collected is primarily solid, first open the holding tank drain plug to allow any trapped liquids to escape.
Page 14
WACHS TRAV-L-VAC 300 MAINTENANCE BLOWER MAINTENANCE SCHEDULE WEEKLY CHECK OIL LEVEL: Stop blower. Wait 5 minutes. Remove oil breather and oil level plug. Add oil until oil runs out level holes. Re- place breather and level plugs. GREASE BEARINGS: Grease drive end bearings with NLGI grade 2 EP grease in a pressure gun.
Page 15
WACHS TRAV-L-VAC 300 GENERAL MAINTENANCE SCHEDULE DAILY Check suction hoses for any abrasions, holes, kinks or damaged connectors. Replace as needed. Verify that all dump gate and filter lid camps are se- cured tight. Adjust if necessary. Clean any debris from dump door seal.
WACHS TRAV-L-VAC 300 ORDERING INFORMATION To place an order or to get more detailed information on any E. H. Wachs product, call us at: 1- (800) - 323 - 8185 In the U.S.A. 1- (847) - 537 - 8800 Worldwide ORDERING REPLACEMENT PARTS Please use parts lists provided in manual.