Page 2
WARNING 1. Please make sure to turn off the power before starting the installation. 2. Installation must be performed by a qualified electrician. This marking indicates that this Caution, risk of product should not be disposed electric shock. of with other household wastes. CONTROL PANEL POWER BUTTON UP BUTTON...
Page 3
HUMAN-COMPUTER INTERACTION CONTENT Project Functi on There are 6 display interfaces in total: 1. Main interface information (voltage/current/SOC/status code); 2. Secondary main interface information (maximum and minimum cell voltage/maximum and minimum temperature); 3. Display 1~4cell voltage; 4. Display 5~8cell voltage; 5.
Page 4
INTERFACE DEFINITION Port Port type NO Signal name Remark BAT+ Battery positive output interface Battery output interface BAT- Battery negative output interface Battery output switch (control Battery output switch Battery positive) CAN-H CAN bus high level CAN-L CAN bus low level null null 485-A...
Page 5
Port Port type NO Signal name Remark Dry contact 1 Dry contact 1 (3.81 3P COM1 Dry contact 1public Terminal Phoenix Terminal) Dry contact 1 normally closed Terminal Dry contact 2 normally open Terminal Dry contact 2 (3.81 3P COM2 Dry contact 2 public Terminal Phoenix Terminal) Dry contact 2 normally closed...
Page 28
How to choose inverter. l UP Key ---- Press and hold for 5 seconds until InvType appears with "highlighting" characters, release the UP key l UP Key ---- Press once to increase by 1, and the inverter code will cycle repeatedly from 0 to 16 l UP Key ---- Keep pressing for 5 seconds until InvType appears without "highlighting"...
Need help?
Do you have a question about the VT-5139 and is the answer not in the manual?
Questions and answers