Download Print this page

Advertisement

Quick Links

© 2023
REV 01/2023
Order #XXXXX
VK-1973 Inline Lightbox
10'
10'
Plan View

Advertisement

loading
Need help?

Need help?

Do you have a question about the VK-1973 and is the answer not in the manual?

Questions and answers

Summary of Contents for SUPERNOVA VK-1973

  • Page 1 © 2023 REV 01/2023 Order #XXXXX VK-1973 Inline Lightbox 10’ 10’ Plan View...
  • Page 2: Plan View

    © 2023 Order #XXXXX Plan View = 1 sq foot...
  • Page 3: General Setup Instructions

    © 2023 Order #XXXXX General Information General Setup Instructions - Read entire setup instruction manual prior to WARNING unpacking parts and pieces. - The setup instructions are created specifically for this configuration. - Setup instructions are laid out sequentially in steps, including exploded views with detailed explanation for assembly.
  • Page 4 © 2023 Order #XXXXX CEI110 Frame Assembly Disassembly Slide both connectors across seam of extrusions. Tighten all knobs. Straight Connection 1) Loosen all knobs. Straight Connector When assembling frame, first attach all straight 2) Slide connectors off of one extrusion. connectors, then attach corner connectors.
  • Page 5 © 2023 SEG Installation Order #XXXXX Graphic Removal Corner A Corner B Corner D Corner C Step 1 Step 2 Step 3 It is important to first insert To remove the graphic from Insert corner A. Turn edge of Repeat Step 1 for opposite Once all corners are inserted, graphic into each alternate the frame, locate the fabric...
  • Page 6 © 2023 Order #XXXXX Crate Packing CRATE PACKING Crate 1 of 1...
  • Page 7 © 2023 Order #XXXXX Closet Assembly Base Plate Attachment Z45 Attachment Item Qty. Description Steps: Vertical Wing Nut Extrusion 5,5A 42” CEI110 Horizontal Extrusion Steps 1 to 3 can be assembled flat on floor. See CEI110 Frame Assembly sheet. Bolt Washer 6,6A 95”...
  • Page 8 © 2023 Order #XXXXX Closet Assembly (cont’d) Item Qty. Description Steps: 70” Z45 Horizontal Extrusion 1) Attach closet side to vertical [9] and closet door to vertical [9A], using bolts, making sure the Velcro is facing to back. 2) Attach horizontals [16] between [12] and [15A], making sure the Velcro is facing to back.
  • Page 9 © 2023 Order #XXXXX MOD-1702 Counter Assembly Item Qty. Description Steps: 39.5” S44 Vertical Extrusion 1) Assemble lower horizontals [7,8,9,10] between 39.5” S44 Vertical Extrusion verticals [1,2,3,4,5]. 39.5” S44 Vertical Extrusion 2) Slide Infills between verticals as shown. 39.5” S44 Vertical Extrusion 3) Attach upper horizontals [7A,8A,9A,10A], securing infills.
  • Page 10 © 2023 Order #XXXXX MOD-1702 Counter Assembly (Cont’d) Item Qty. Description 11,11A 35.853”h Z33 Vertical Extrusion Frame to Assembly Attachment 38.752” TSP2 Vertical Extrusion Z31 & Bracket Connection 21,21A 3.193” Z31 Horizontal Extrusion CEI110 39.5” CEI110 Vertical Extrusion 23,23A 47.75” CEI110 Horizontal Extrusion CEI110 39.5”...
  • Page 11: Back View

    © 2023 Order #XXXXX MOD-1702 Counter Attachments Steps: 1) Connect lighting power cords and attach transformers. See Light to Light Connection Light to Transformer Connection details. Place shelves onto pins. See Shelf Pin detail. 3) Place counter top on top of assembed counter base. Counter Top Attachment detail.