GOOD PRACTICES AND SAFETY INSTRUCTIONS ............3 1/17 Preamble ........................4 E-VLT............................4 LEAK TEST ..........................4 PRINCIPE OF CYCLE ......................5 Your E-VLT ........................ 6 FRONT PANEL ........................6 BACK PANEL ......................... 6 COUPLERS ..........................7 POWER SUPPLY CONNECTORS ..................7 DIGITAL LINKS ........................7 User interface ......................
Page 3
ATEQ Manufacturer Plants - Measurement Solution, Global Leader. 2/17 E-XTEQ 30, rue des Dames, Z.I. e-xteq.com Tél. : +33 1 30 07 1330 78340 LES CLAYES-SOUS-BOIS FRANCE We continuously work on improving our products. This is why information contained in this man- ual, the device and the technical specifications may be modified without prior notification.
— Do not open a connected device. — Avoid splashing water on the device. E-XTEQ is at your disposal for any information concerning the use of the device under maxi- mum safety conditions. We draw your attention to the fact that E-XTEQ cannot be held responsible for any accident related to a misuse of the measuring instrument, the workstation or non-compliance of the in- stallation with safety rules.
Preamble E-VLT E-VLT is a leak detector able to test large volume like EV battery housing and cooling. 4/17 E-VLT can memorise 128 different test programs and 32 batteries sets of programs. LEAK TEST Leak test and Desenzitizes Mode The test pressure is applied to the input of the test part 3.
PRINCIPE OF CYCLE The measurement cycle is made of 4 mains phases : fill, stabilization, test, dumping. 5/17 0 Waiting phase 1 Fill phase 2 Stabilization phase 4 Dumping QSG-EVLT-00449_R00_XXXX00_01_EN_2022-11-02...
Your E-VLT FRONT PANEL The user interface is located on the front panel. 6/17 Touchscreen Display USB Connectors BACK PANEL Part number / Serial number Exhaust output Test part connector Calibration informations Connector for 100 / 240 V AC power supply...
COUPLERS Different couplers are mandatories to test Housing or cooling system. They must be connected on the test pipe fast connector.. 7/17 POWER SUPPLY CONNECTORS 100 / 240 V AC connector (J7) The device can be connected to a 100 / 240 V AC power supply (option). This connector has a ON/OFF button.
User interface OVERVIEW 8/17 KEYS Cycle keys The cycle keys are used to start and to stop a measurement cycle. Name Function Starts a measurement cycle and opens the Measurement Start cycle screen. Reset Stops the measurement cycle in progress. Keys The navigation keys are used to select menus/options and change parameter values.
POWER UP 1. Make sure that all the necessary connections are in place. 2. Power up your device When Power up part under pressure must NOT be connected to the instrument. 9/17 Then the instrument propose an autotest. MAIN MENU screen The MAIN MENU screen gives access to different sections for managing the device and the test parameters.
PREPARING A PROGRAM Use this process to configure a new test program. On the MAIN MENU screen : 1. Select « Battery » Menu 10/17 2. Select « Parameters » Menu (requires Expert Rights) The program list is displayed. 1. Home : returns to main menu 2.
PREPARING A BATTERY GROUPS PROGRAMS 1. Select « Battery » Menu 11/17 2. Select the battery group you want to edit 3. Modify parameters For more details refer to chapter : User Adjustment / Battery parameters 4. Press HOME to come back to main menu SELECTING A BATTERY TO TEST 1.
STARTING AND STOPPING CYCLE When the expected program is selected. Starting a measurement cycle 1. Press Start. 12/17 The cycle phases of program are successively displayed : FILL STABILISATION TEST DUMP At the end of the test time, the result is display. Measurement cycle screen It displays the different values of the current test (or last one).
User adjustments PROGRAM PARAMETERS Use this menu to configure the measurement cycle associated to each test program. 14/17 Groups Parameters Descriptions Name Text field to easily organise program (Ex: batteryName Hous- ing) Test type: Leak per default Timers Waiting time Time before starting the cycle Fill Time Necessary time to fill the battery at the pressure instruction...
Test 1 Housing Program selected to make Housing TEST Test 2 Cooling Program selected to make Cooling TEST CONFIGURATION MENU Use this menu to configure your E-VLT device. Parameters Descriptions Date Define correct Date and Time. it is important for results stored.
RESULTS MENU In this section you can observe the results of the last 50 cycles. 16/17 Connecte a USB memory stick and press the white key to transfer data from the instruments : - Key/SerialNumber/Campaign : all the measurement done with auto chaining mode - Key/SerialNumber/Results : all the measurement done - Key/SerialNumber/jobs/ : all the measurement done with Job mode FCC Warning...
Specifications CARACTERISTICS Technical characteristics of the device. 17/17 Main characteristics : Characteristics Values Mass About 8,5 kg (18.7 lbs) Electrical power supply 100 / 240 V AC 55 W - 50/60 Hz Overvoltage category Air supply From -10 to 250 kPa Pneumatic connections: Fast connector Staubi RBE 03 Operation temperature...