Lorentz PS Commander Manual For Installation And Operation

Lorentz PS Commander Manual For Installation And Operation

Monitoring and managing systems remotely

Advertisement

Quick Links

PS Commander
Monitoring and managing systems remotely
Manual for Installation and Operation
EN
The Solar Water Pumping Company

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PS Commander and is the answer not in the manual?

Questions and answers

Summary of Contents for Lorentz PS Commander

  • Page 1 PS Commander Monitoring and managing systems remotely Manual for Installation and Operation The Solar Water Pumping Company...
  • Page 2: Table Of Contents

    Placement of the PS Commander....... .8 Subscribe to the LORENTZ Global service which Start-up and operation ..
  • Page 3: Product Features

    ƒ 19-001860/19-001870: 2G/4G (LTE-M1 or in a closed and dry room. The PS Commander can be governments. LTE-NB) stored in the range of -4 °F to 122 °F (–20 °C to 50 °C).
  • Page 4: Wiring

    PV-Module characteristics 4.2.1 Battery 4.2.3 Fuse If a battery is not delivered by LORENTZ, it must Use the 2 pin battery plug with the pre-assembled The fuse is switched in the red cable (plus) of the meet the following characteristics: cables.
  • Page 5: Placement Of The Ps Commander

    Place the PV-Module holder at least 10cm (3.95 in) the Commander. installation, battery installation and an established above the PS Commander. The holes in the wall, for ƒ connect to the best network available pump connection before finally mounting the PS the PV module holder, have to be 330mm (13.0 in)
  • Page 6: No Connection To Telecommunication Network

    ƒ the antenna cable is not broken 6.5 SIM card ƒ the antenna cable is screwed tightly to the The PS commander will try to find a network until it Figure 3: Insert SIM card terminal is connected. If it does not find a network there is a risk of emptying the battery.
  • Page 7 Sun. Water. Life. www.lorentz.de...

Table of Contents