Page 1
StradaPAL Rapide, Transfer and Cashless Installation manual Ref.: 504015710_1...
Page 2
Copyright November 2013 Parkeon. All rights reserved. Parkeon reserves all proprietary rights relating to the contents of this document. Parkeon reserves all rights over usage, reproduction, representation, marketing, translation, adaptation or modification, and generally all rights over present and future utilisation by any means, for any purpose and in any territory, throughout the period of protection.
14.2 Installation with excavation anchoring and variable height ....34 14.3 Installation with chemical anchoring on flat ground without base box ..35 14.4 Installation with chemical anchoring on flat ground with base box ..36 StradaPAL – Installation manual 3/43...
Page 4
16. Applying the stickers ..............39 17. Installing the batteries ..............40 17.1 Installing the mains battery (if present) ......... 40 17.2 Installing the solar batteries (if present) ......... 41 18. Putting into service ..............43 StradaPAL – Installation manual 4/43...
1 - Safety Safety Parkeon products are designed to minimise risks to users and operators from electrical power supplies, high temperature, fires, mechanical injuries, radiation and chemicals. The product complies with the following directive: Directive 2004/40/CE of the European Parliament and of the Council of 29 April 2004...
Page 6
Take care not to hurt yourself with the open door or any other projecting parts or parts fixed on the terminal. Temperature Always wait for a few minutes after turning the Pay & Display machine off before you start working close to hot areas of the intermittent heating devices. StradaPAL – Installation manual 6/43...
Page 7
Comply with the applicable local regulations while disposing of these items. IMPORTANT: Parkeon shall not be liable in the event of any changes or incorrect use of the Pay & Display machine other than as described in this document.
The data and illustrations in this document are subject to change. Please check with your Parkeon contact if your document is still valid. The warranty on Parkeon equipment and software is dependent on compliance by the customer with the transport, storage, installation, operation and maintenance conditions set out by Parkeon in installation, operation and maintenance manuals.
3.2 Transport of terminals after they are taken off the transport pallets While moving terminals after they are taken off their transport pallets, Parkeon recommends the use of trucks: with star wheels in order to make it easier to move the terminal on the site (climbing onto pavements etc.),...
The terminal comprises four main areas: top, area devoted to the user interface and maintenance, collection compartment, power supply compartment. Area devoted to users and maintenance Collection module Power supply module StradaPAL – Installation manual 10/43...
4 - Description of the terminal 4.2 Dimensions and weight of the terminal The terminal has the following dimensions: 92.5 The terminal weighs approximately 90 kg (without the battery - the weight may vary depending on the optional equipment present). StradaPAL – Installation manual 11/43...
5 - Installation chart Installation chart Preparing the installation Anchoring Opening the maintenance door and the mains door Taking the terminal off the pallet Terminal installation and levelling Installing the protective top and the antenna Installing the batteries StradaPAL – Installation manual 12/43...
That means that the space stated below must be provided in relation to any obstacles that may be present (walls, trees etc.): Rear 35 cm 35 cm 35 cm 115 cm Dimensions from the centre of the base of the terminal StradaPAL – Installation manual 13/43...
Mains supply cable tube: 50 cm diameter. Minimum mains supply cable section: 2.5 mm² (AWG 12). Overview of the arrival of the tube at the centre of the housing: 1: mains supply cable tube 90 mm Terminal base (top view) StradaPAL – Installation manual 14/43...
The type of installation is to be chosen depending on the type of use: access to persons with reduced mobility, etc. For more details about the various installation heights, please refer to the section "Final installation diagram and user interface height". StradaPAL – Installation manual 15/43...
(length: 500 mm) Anchoring guard plate (for variable height installation only) 1 or 2 Removal protection nut(s) (optional) The removal protection nut (or nuts) is (are) not supplied with the excavation fastening kit, but with the terminal. StradaPAL – Installation manual 16/43...
- Mind the positioning direction: the front of the base box must be placed according to the direction of the terminal to be installed on it. Front of the base Put in place the form in the base box (if used). Base Form StradaPAL – Installation manual 17/43...
Page 18
Screw 4 nuts on the anchoring rods up to the base box. Finishing Lower These 4 nuts, which are used to level the terminal, are called "lower nuts" in the rest of the procedure. StradaPAL – Installation manual 18/43...
104 mm away from the fastening brackets. Protection plate Base Fastening Anchoring bracket The nuts are to be placed (104 mm away from the end of the anchoring rods) as instructed for secure installation. StradaPAL – Installation manual 19/43...
Page 20
- Check that the holes for letting water out of the base box are not blocked. Draining holes Front of the base Height 1 Height 2 Height 3 StradaPAL – Installation manual 20/43...
Page 21
Screw 4 nuts on the anchoring rods up to 12 mm above the base box. Lower nut Base These 4 nuts, which are used to level the terminal, are called "lower nuts" in the rest of the procedure. StradaPAL – Installation manual 21/43...
- one or two removal protection nuts (optional). IMPORTANT: The chemical anchoring kit is not supplied by Parkeon. Parkeon recommends the use of a SPIT C mixplus chemical anchoring kit. Check the drilling diameter required depending on the type of chemical anchoring required.
Page 23
M16 nut M16 washer M16 threaded rod (450 mm) 1 or 2 Removal protection nut(s) (optional) The removal protection nut (or nuts) is (are) not supplied with the excavation fastening kit, but with the terminal. StradaPAL – Installation manual 23/43...
After drilling, clean the holes with the rifle brush and then the blow nozzle in order to remove dirt. Check the drilled holes by inserting the threaded rods in the holes and checking that 60 mm of rod is emerging. StradaPAL – Installation manual 24/43...
Page 25
When the anchoring has set, screw 4x M16 nuts on the threaded rods up to the ground level. Lower nut These 4 nuts, which are used to level the terminal, are called "lower nuts" in the rest of the procedure. StradaPAL – Installation manual 25/43...
Identify the location of the future centre of the terminal in accordance with the dimensional requirements detailed in the "Dimensions" section. Drill 4x Ø20 holes in the floor over a depth of 250 mm, on the basis of the drawing below: StradaPAL – Installation manual 26/43...
Page 27
When the anchoring has set, screw 4 nuts on the threaded rods up to 12 mm above the base box. Lower nut Base These 4 nuts, which are used to level the terminal, are called "lower nuts" in the rest of the procedure. StradaPAL – Installation manual 27/43...
9 - Recommendations for anchoring protection Recommendations for anchoring protection To protect anchoring standing by for terminal installation, Parkeon recommends the use of anchoring protection, placed on the threaded rods. Anchoring protection StradaPAL – Installation manual 28/43...
When the lock is accessible, insert the key and unlock the door (3). Open the maintenance door. Guard covers Lock detail Closing: Close the door and lock it with the mechanical key. Remove the mechanical key from the lock. StradaPAL – Installation manual 29/43...
Lift the door lock. Door locking Door flap lock If there is a lock, unlock the door using the square key. After installing the terminal, put the door lock back down to lock access to the door. StradaPAL – Installation manual 30/43...
Unscrew the four screws that are used to fasten the terminal to the pallet (16-mm key) taking care not to allow the terminal to tip over. Take the terminal off the pallet. Screw (x4) StradaPAL – Installation manual 31/43...
(if used) on the threaded rod to the right at the rear. Screw the removal protection nut (or nuts) with a 24-mm spanner up to the breaking point. StradaPAL – Installation manual 32/43...
14 - Final installation diagram and user interface height 14. Final installation diagram and user interface height 14.1 Installation with excavation anchoring at minimum height Installation in excavation at minimum height StradaPAL – Installation manual 33/43...
14 - Final installation diagram and user interface height 14.3 Installation with chemical anchoring on flat ground without base box StradaPAL – Installation manual 35/43...
14 - Final installation diagram and user interface height 14.4 Installation with chemical anchoring on flat ground with base box StradaPAL – Installation manual 36/43...
(with a cone of sealing filler) in the four holes provided. Fasten the four collar nuts from the maintenance compartment using a 13- mm key. Protective Zone indicator (optional) Communication antenna cable Housing Installing with indicator StradaPAL – Installation manual 37/43...
Page 38
Route the cable of the communication antenna along the left-hand panel of the housing. Hold in place with plastic ties. Connect the communication antenna to the connector of the modem present in the intelligence module. StradaPAL – Installation manual 38/43...
16 - Applying the stickers 16. Applying the stickers If they have not been applied, apply the various stickers on the terminal as illustrated below. StradaPAL – Installation manual 39/43...
Install the mains battery in the support present in the rack. Connect the mains battery cable to the battery, minding the polarities (quick type lugs). Connecting the mains battery cable Close the maintenance door. StradaPAL – Installation manual 40/43...
Connect the solar battery cable to the first battery, minding the polarity. Stack the following while connecting both lugs (starting from the edge of the battery): screw/battery lug/tooth lock washer/cable lug/toothed collar nut. Stack Close the maintenance door. StradaPAL – Installation manual 41/43...
Page 42
Put the protective cover in place on the battery, routing the cables through the open side at the rear of the cover. Rear of the cover Battery cover Close the power supply compartment door. StradaPAL – Installation manual 42/43...
18 - Putting into service 18. Putting into service Please refer to the StradaPAL maintenance manual for the starting up procedure. StradaPAL – Installation manual 43/43...
Need help?
Do you have a question about the StradaPAL and is the answer not in the manual?
Questions and answers