5. Re-install the lower section of the enclosure to the ground stake using the
M10 hex head screws, washers, and nuts.
NOTE: Make sure the lower section of the enclosure is as close to the ground as
possible without touch the ground surface.
6. Install the data logger. Refer to the procedure specific to the data logger.
•
Install a DT2011B Data Logger
•
Install a DT2055B Data Logger
•
Install an Affinity Data Logger
ELI0095A
RST Instruments Ltd.
Secondary Enclosure
Installation Guide
Page 6
Need help?
Do you have a question about the DT2011B and is the answer not in the manual?