  • Page 2 The design, materials and workmanship incorporated in the construction of VOGT pumps allow for a long, trouble-free service life. The life and satisfactory performance of the VOGT pumping equipment, in any case, depend on a correct application, installation and, in addition, of a periodic inspection and careful maintenance.
  • Page 3 • Never operate the pump beyond the operating range for which it was ordered. • Never change the service conditions without the respective approval and authorization of VOGT S.A. • Always disconnect electrical power to the motor before performing repair and maintenance work.
  • Page 4 2.4 Risks due to Non-Compliance with Safety Instructions VOGT S.A. declines all responsibility that may arise from not respecting the safety standards in force at any time, during the handling, installation or operation of its equipment.
  • Page 5 The nameplate attached to the pump describes the most important features of the equipment purchased: Serial Number Flow rate ( m3 / h ) Impeller Diameter ( mm ) INDUSTRIA MECANICA VOGT S.A. Pump length ( mm ) ALVAREZ DE TOLEDO 669 SANTIAGO - CHILE Bushing Material 2004 N°...
  • Page 6 Equipment Description 3.3 Sectional Section Centrifugal Pump Assembly Cut A-A Figure 3...
  • Page 7 Equipment Description 3.4 Details of Sectional Cutting of Upper Bearing, Lower Bearing and Impeller Detail X 1:1 Figure 4 Figure 5 Detail Y 1:1 Detail Y 1:1 Figure 6...
  • Page 8 Equipment Description 3.5 Description of Parts and Pieces Bolt with Nut Impeller Bearing housing - Cantilever support Pump Body Motor Support Bolt - Electric Motor Bolt Pump Body Cover Upper Suction Disk - Lower Suction Disk Bolt Bushing stop Lower Bearing Cover - Cantilever Support Bolt Bushing Shaft...
  • Page 9 Check upon arrival that the pump and accessories have not been damaged or lost in transit. If so, take note and report any damaged or missing parts immediately to VOGT S.A., the authorized distributor or the company that carried out the transport.
  • Page 10 Installation 4.3 Field Installation of the Pump 4.3.1 Pumping Equipment Handling • Use slow movements when handling the pumping equipment. • Lift the pumping equipment with suitable lifting equipment to support the weight of the complete equipment. • Position the pump where it can be handled without dragging the lower suction disk surface on the floor during the lifting motion.
  • Page 11 Installation 4.3.2 Field Installation of the Pump Field installation of the pump should be done with care to prevent damage and ensure proper operation. Check that the shaft rotates freely when driven by hand by removing the protection grid from the core, then reinstall it after verification.
  • Page 12 Start-up 5.1 General Considerations After a pump has been properly installed, it is ready to be put into service. However, before initial start-up, the following considerations are recommended: • Check and follow motor manufacturer's lubrication instructions. • Check that the shaft turns freely when operated by hand. If it does not rotate freely. Check installation instructions.
  • Page 13 Start-up 5.2.2 Instructions for the Connection of Three Phase Electric Motors To make a delta connection, in the electric motor box are placed the bridges connecting: U with Z, V with X, W with Y. The wires from the electric panel to the motor junction box connect the terminals: U to U, V to V. W to W (figure 12-a). To make the connection (star) connect together the three terminals: X-Y-Z of the junction box AND connect the terminals U-V- W with the corresponding terminals U-V-W on the electrical panel.
  • Page 14 Maintenance CAUTION 6.1 General Considerations • Adequate and periodic maintenance of the pumping equipment is essential to obtain a good level of performance and an extension of the service life. • For the motor, the required service intervals and the type of maintenance to be performed are described in the MAINTENANCE SCHEDULE described in the respective motor manual provided by the manufacturer, attached to this manual.
  • Page 15 Maintenance 6.5 Impeller Clearance Adjustment WARNING Disconnect electrical power to the motor to prevent accidental starting of the pumping equipment and possible personal injury. 6.5.1 Impeller Backlash Adjustment Using Magnetic Base Dial Gauge 1.- Remove the grid from the plug cover. 2.- Remove the flexible body from the coupling hub.
  • Page 16 Maintenance 6.5.2 Impeller Clearance Adjustment Using Calibrated Blades 1.- Remove the grid from the plug cover. 2.- Remove the flexible body from the coupling hub. 3.- Loosen the shaft adjustment bolts (fig. 14) until a clearance of about 5 to 8 mm is obtained. 4.- Tighten the bolts of the Bearing Housing - Cantilever Support (fig.
  • Page 17 VOGT S.A. to indicate the same.
  • Page 18 Useful Tips for trouble-free operation 8.1 Normal Operating Conditions This type of equipment can run dry for a long time without damage since it does NOT use a mechanical seal or a support bushing, elements that require lubrication and cooling. In some applications when the suction submergence is insufficient and the equipment stops pumping a continuous flow and starts pumping intermittently, the vibrations can increase their amplitude generating in turn an increase in the temperature of the bearings, if this condition remains for some time it is convenient to stop the equipment to prevent premature failures in the...
  • Page 19 Useful Tips for trouble-free operation 8.4 Pump Overloads Motor Possible Causes Solutions 1.- The motor operates with only two • Check and control the power supply to the motor. phases 2.- The pumped liquid has a viscosity or density different from that for which •...
  • Page 20 • Our Technical Service is the only one authorized to intervene in equipment within the warranty period. • If the pump does not work properly, DO NOT disassemble it, look for the fault in the installation. All VOGT equipment has been satisfactorily tested at the factory.
  • Page 21 High-End Services We have specialized engineers with great experience in hydraulic systems, developing an excellent service. We have implementad a comprehensive service system, which allows us to provide effective and timely solutions far each of our clients, independent of the industrial sector to which they belong. In-Site Services Multi-Brand Technical Service ln-Site Repairs.
  • Page 22 Our Company It was founded in 1954 as a company dedicated to the manufacture of Pumps, with great success in the agricultural sector. Thanks to an intense development of technologies, engineering and innovation, we position ourselves as a leader in the manufacture and commercialization of solutions and pumping equipment in a wide spectrum of markets, such as mining, construction, agriculture, sanitation and the industrial sector in general.
  • Page 23 COMMERCIAL OFFICE IQUIQUE ANTOFAGASTA BRANCH (+56-55) 245 6600 (+56-55) 245 6600 El Salitre 7745 (+56-9) 6229 4764 antofagasta@vogt.cl iquique@vogt.cl HEAD OFFICE SANTIAGO COPIAPÓ BRANCH (+56-2) 2829 1200 (+56-52) 2210 954 Ojos del Salado 0851, Quilicura Panamericana Norte 3604, Local 3, Bodega 3 vogt@vogt.cl...