Shield Key Enterprise Quick Installation Guide
Box Contents:
•
One (4U or 2U) Shield Key Enterprise system
•
Rackmount Kit
•
Chassis Accessories box
•
Hard disk drives (Quantity as shipped)
•
Two 110V AC power cords
•
Shield Key Enterprise Quick Installation Guide (this document)
•
Shield Key Enterprise Quick Reference
Step 1 – Unpack the components
The Shield Key Enterprise system is shipped separately from its hard disk drives. The contents of the Shield
Key Enterprise system box can be unpacked by a single person, but it is recommended that two people
remove the server from the box.
Step 2 – Install the Rackmount Kit on the Chassis
A rackmount kit is included with Shield Key Enterprise system so it can be installed into a standard computer
equipment rack. The rackmount kit is not installed to facilitate the shipment of the Shield Key Enterprise
system. Refer to the Shield Key Enterprise Quick Reference guide for installation instructions or the
documentation shipped with the rackmount rail kit.
Step 3 – Cabling the Shield Key Enterprise
The Shield Key Enterprise requires two AC power sources. Two power cords are included with the Shield Key
Enterprise system. Connect both power cords. Only connect a monitor to the
monitor to the DisplayPort or DVI port as this will cause the remote KVM function in IPMI to not function) as
well as a Keyboard and mouse to their respective USB ports. Network connectivity is required during the
operation of the Shield Key Enterprise. Plug in at least one Ethernet cable into an Ethernet port of the Shield
Key Enterprise.
Arxys | 435 West Bradley Ave, Suite C | El Cajon, CA 92020 | (800) 257-1666 | www.arxys.com
October 11, 2018
VGA
port (do NOT connect a
1
Need help?
Do you have a question about the Shield Key Enterprise and is the answer not in the manual?
Questions and answers