Preparations; Mounting - Cello 502432086 Mounting And User Instructions

Side awning
Table of Contents

Advertisement

Available languages
  • EN

Available languages

Preparations

Make sure that no children and pets are present during mounting. They could get hurt by lain out parts or
tools.
Carefully remove the box and remove the protectors from side awning. Remove the plastic bags from the awing and
carefully place the awning aside to avoid having it damaged by scratches or otherwise damaged or soiled during
assembly. Check the number of parts in the packaging whether the packing list requirements, the quality of parts
availability issues, if questions, please contact the supplier.
Tools needed for assembly:
Drill
Masonry drill bit, 14 mm and 10mm
Level
Wrench 10mm, 17 mm

Mounting

If your building has an exterior shell (such as insulation, double brick floor, brick facing), installation should be
taken out by a professional.
For safe and smooth installation think about where you will be securing the awning to the wall before you
start drilling holes.
STEP 1: CHOSE MOUNTING LOCATION
For safe and smooth installation think about where you will be securing the awning to the wall before you start drilling holes,
Make sure the wall/support place is plain, so that bracket seats solidly.
C E L L O
4mm hexagon spanner
Tape measure
Chalk or marker pen
Hammer
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

6438313685456

Table of Contents